A platform for research: civil engineering, architecture and urbanism
Quick mounting base for telegraph pole
The invention relates to a telegraph pole fast mounting base, which relates to a fast mounting telegraph pole, and is characterized in that the outer edges of an upper steel ring (1) and a lower steel ring (6) which are arranged at an interval are fixedly connected with the inner sides of a plurality of triangular plates (4), an annular plate (5) is arranged at the lower parts of the outer ends of the plurality of triangular plates (4), a plurality of extension plates (3) are arranged around the annular plate (5), and a plurality of fixing holes (9) are respectively formed in the annular plate (5) and the extension plates (3); steel nails (10) matched with the fixing holes (9) in number are fixedly connected with the ground; the lower part of the telegraph pole penetrates through ring holes of the upper steel ring (1) and the lower steel ring (6); the multiple steel rings are connected with the outer edge of the lower end of the steel pipe telegraph pole, the multiple steel rings are positioned through the triangular plates, and the telegraph pole is quickly assembled by fixedly connecting the annular plates and the extension plates with the ground.
一种电线杆快装基座,涉及一种快装电线杆,间隔设置的上部钢环(1)和下部钢环(6)外缘与多个三角板(4)内侧固定连接,多个三角板(4)的外端下部设有环板(5),在环板(5)四周设有多根延伸板(3),环板(5)和延伸板(3)上分别设有多个固定孔(9),由与固定孔(9)匹配数量的钢钉(10)与地面固定连接;电线杆下部穿在上部钢环(1)和下部钢环(6)的环孔中;本发明利用多个钢环与钢管电线杆下端外缘连接,由三角板对多个钢环定位,通过环板和延伸板与地面固定连接获取了电线杆的快装。
Quick mounting base for telegraph pole
The invention relates to a telegraph pole fast mounting base, which relates to a fast mounting telegraph pole, and is characterized in that the outer edges of an upper steel ring (1) and a lower steel ring (6) which are arranged at an interval are fixedly connected with the inner sides of a plurality of triangular plates (4), an annular plate (5) is arranged at the lower parts of the outer ends of the plurality of triangular plates (4), a plurality of extension plates (3) are arranged around the annular plate (5), and a plurality of fixing holes (9) are respectively formed in the annular plate (5) and the extension plates (3); steel nails (10) matched with the fixing holes (9) in number are fixedly connected with the ground; the lower part of the telegraph pole penetrates through ring holes of the upper steel ring (1) and the lower steel ring (6); the multiple steel rings are connected with the outer edge of the lower end of the steel pipe telegraph pole, the multiple steel rings are positioned through the triangular plates, and the telegraph pole is quickly assembled by fixedly connecting the annular plates and the extension plates with the ground.
一种电线杆快装基座,涉及一种快装电线杆,间隔设置的上部钢环(1)和下部钢环(6)外缘与多个三角板(4)内侧固定连接,多个三角板(4)的外端下部设有环板(5),在环板(5)四周设有多根延伸板(3),环板(5)和延伸板(3)上分别设有多个固定孔(9),由与固定孔(9)匹配数量的钢钉(10)与地面固定连接;电线杆下部穿在上部钢环(1)和下部钢环(6)的环孔中;本发明利用多个钢环与钢管电线杆下端外缘连接,由三角板对多个钢环定位,通过环板和延伸板与地面固定连接获取了电线杆的快装。
Quick mounting base for telegraph pole
一种电线杆快装基座
FANG TAO (author) / ZHANG XIAOTAO (author) / LIU KAI (author) / YUN FEILONG (author) / QI HONGLIANG (author) / ZHANG JIANGTAO (author) / WANG CHENCHEN (author) / WANG CHAOLE (author) / HUANG LEIFENG (author) / LYU BAOBAO (author)
2023-11-17
Patent
Electronic Resource
Chinese
IPC:
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
Device for erecting telegraph pole and telegraph pole mounting equipment
European Patent Office | 2021
|European Patent Office | 2023
|