A platform for research: civil engineering, architecture and urbanism
Construction equipment for carrier pile
The invention provides carrier pile construction equipment which comprises a construction equipment body, the construction equipment body comprises a base, supporting frames are fixedly welded to the base, a movable seat is movably installed between the supporting frames, a fixing assembly is movably installed on the movable seat, and a protective cylinder is movably installed in the fixing assembly. And a rammer is movably mounted in the protective cylinder. According to the construction equipment for the carrier pile, when the construction equipment is used, the extrusion mechanism extrudes and limits the protective barrel between the fixing assemblies, the movable seat integrally downwards pushes the protective barrel to move downwards through the thrust of the lifting mechanism, assistance is provided for descending of the protective barrel, and the protective barrel can be quickly descended and used in the later period conveniently; and after the lifting mechanism cannot push the protective cylinder to descend in the later period, the rammer is moved to the topmost portion, the limiting block is exposed, the rammer rams the protective cylinder through the limiting block, and therefore the protective cylinder is descended again for use.
本发明提供一种载体桩的施工设备,包括施工设备本体,所述施工设备本体包括底座,所述底座上焊接固定有支撑架,所述支撑架之间活动安装有活动座,所述活动座上活动安装有固定组件,所述固定组件的内部活动安装有防护筒,所述防护筒的内部活动安装有夯锤。该一种载体桩的施工设备,在使用时将挤压机构将防护筒挤压限位在固定组件之间,通过升降机构的推力使活动座整体向下推动防护筒向下移动,为防护筒的下降提供助力,便于后期防护筒的快速下降使用,后期升降机构无法推动防护筒下降后,将夯锤移动至最顶部,将限位块露出,夯锤通过限位块对防护筒夯击,从而完成防护筒的再次下降使用。
Construction equipment for carrier pile
The invention provides carrier pile construction equipment which comprises a construction equipment body, the construction equipment body comprises a base, supporting frames are fixedly welded to the base, a movable seat is movably installed between the supporting frames, a fixing assembly is movably installed on the movable seat, and a protective cylinder is movably installed in the fixing assembly. And a rammer is movably mounted in the protective cylinder. According to the construction equipment for the carrier pile, when the construction equipment is used, the extrusion mechanism extrudes and limits the protective barrel between the fixing assemblies, the movable seat integrally downwards pushes the protective barrel to move downwards through the thrust of the lifting mechanism, assistance is provided for descending of the protective barrel, and the protective barrel can be quickly descended and used in the later period conveniently; and after the lifting mechanism cannot push the protective cylinder to descend in the later period, the rammer is moved to the topmost portion, the limiting block is exposed, the rammer rams the protective cylinder through the limiting block, and therefore the protective cylinder is descended again for use.
本发明提供一种载体桩的施工设备,包括施工设备本体,所述施工设备本体包括底座,所述底座上焊接固定有支撑架,所述支撑架之间活动安装有活动座,所述活动座上活动安装有固定组件,所述固定组件的内部活动安装有防护筒,所述防护筒的内部活动安装有夯锤。该一种载体桩的施工设备,在使用时将挤压机构将防护筒挤压限位在固定组件之间,通过升降机构的推力使活动座整体向下推动防护筒向下移动,为防护筒的下降提供助力,便于后期防护筒的快速下降使用,后期升降机构无法推动防护筒下降后,将夯锤移动至最顶部,将限位块露出,夯锤通过限位块对防护筒夯击,从而完成防护筒的再次下降使用。
Construction equipment for carrier pile
一种载体桩的施工设备
LI YANG (author) / YU YINGHAO (author) / YANG PEICHENG (author) / CHEN SHIGANG (author) / ZHOU LU (author) / LI QIANG (author) / CHEN WEITE (author) / MA YUNFEI (author) / XU JIANBO (author) / LUO CHAO (author)
2023-11-24
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Carrier pile construction equipment and carrier pile construction method
European Patent Office | 2015
|Construction equipment and construction method of carrier pile
European Patent Office | 2015
|Carrier pile construction equipment with horizontal tamping function
European Patent Office | 2023
|Novel BNT carrier pile and construction equipment construction method thereof
European Patent Office | 2020
|