A platform for research: civil engineering, architecture and urbanism
Combined plate groove embedded part and curtain wall mounting system
The invention provides a combined type plate groove embedded part and a curtain wall installation system. The combined type plate groove embedded part comprises an anchor plate assembly made of a first material and an installation sleeve box made of a second material, and the mechanical strength of the first material is larger than that of the second material; the anchor plate assembly comprises a bearing plate, and at least one strip-shaped hole is formed in the bearing plate. The mounting sleeve box comprises a bottom box and a top cover, a cavity and a flange surrounding an opening of the cavity are formed in the bottom box, and when the bottom box and the top cover are assembled to the bearing plate, the opening of the cavity is communicated with an opening, in the inner side surface of the bearing plate, of the strip-shaped hole. And the top cover blocks the opening of the strip-shaped opening in the outer side surface of the bearing plate. The mounting sleeve box is detachably assembled to the bearing plate, so that the production process of the whole plate groove embedded part is simplified, and the machining efficiency of the plate groove embedded part is improved.
本发明提供了一种组合式板槽埋件及幕墙安装系统,所述组合式板槽埋件包括由第一材料构成的锚板组件和由第二材料构成的安装套盒,且所述第一材料的机械强度大于所述第二材料的机械强度;所述锚板组件包括承载板,所述承载板上具有至少一个条形开孔;所述安装套盒包括底盒和顶盖,所述底盒形成有空腔以及环绕所述空腔的开口的凸缘,且在所述底盒和顶盖装配到所述承载板时,所述空腔的开口与所述条形开孔在承载板的内侧表面的开口相连通,所述顶盖封堵所述条形开孔在承载板的外侧表面的开口。本发明通过将安装套盒以可拆卸的方式装配到承载板,简化了整个板槽埋件的生产工艺,提高了板槽埋件的加工效率。
Combined plate groove embedded part and curtain wall mounting system
The invention provides a combined type plate groove embedded part and a curtain wall installation system. The combined type plate groove embedded part comprises an anchor plate assembly made of a first material and an installation sleeve box made of a second material, and the mechanical strength of the first material is larger than that of the second material; the anchor plate assembly comprises a bearing plate, and at least one strip-shaped hole is formed in the bearing plate. The mounting sleeve box comprises a bottom box and a top cover, a cavity and a flange surrounding an opening of the cavity are formed in the bottom box, and when the bottom box and the top cover are assembled to the bearing plate, the opening of the cavity is communicated with an opening, in the inner side surface of the bearing plate, of the strip-shaped hole. And the top cover blocks the opening of the strip-shaped opening in the outer side surface of the bearing plate. The mounting sleeve box is detachably assembled to the bearing plate, so that the production process of the whole plate groove embedded part is simplified, and the machining efficiency of the plate groove embedded part is improved.
本发明提供了一种组合式板槽埋件及幕墙安装系统,所述组合式板槽埋件包括由第一材料构成的锚板组件和由第二材料构成的安装套盒,且所述第一材料的机械强度大于所述第二材料的机械强度;所述锚板组件包括承载板,所述承载板上具有至少一个条形开孔;所述安装套盒包括底盒和顶盖,所述底盒形成有空腔以及环绕所述空腔的开口的凸缘,且在所述底盒和顶盖装配到所述承载板时,所述空腔的开口与所述条形开孔在承载板的内侧表面的开口相连通,所述顶盖封堵所述条形开孔在承载板的外侧表面的开口。本发明通过将安装套盒以可拆卸的方式装配到承载板,简化了整个板槽埋件的生产工艺,提高了板槽埋件的加工效率。
Combined plate groove embedded part and curtain wall mounting system
组合式板槽埋件及幕墙安装系统
BAI BAOKUN (author)
2023-11-24
Patent
Electronic Resource
Chinese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
European Patent Office | 2024
|European Patent Office | 2024
|