A platform for research: civil engineering, architecture and urbanism
Climbing system of high-rise building construction climbing frame
The invention relates to a high-rise building construction climbing frame climbing system which comprises a climbing frame body, the climbing frame body is vertically arranged on the upper end face of a base, two lifting grooves are formed in the climbing frame body, a driving groove is formed in the bottom of the climbing frame body, a driving mechanism is arranged in the driving groove, and a platform is arranged at the front end of the climbing frame body. The upper end of the rear side wall of the platform is fixedly connected with two symmetrically-arranged fixing plates, and the fixing plates are matched with the driving mechanism to slide in the lifting groove. Protective fences are evenly distributed on the periphery of the upper end face of the platform, protective cloth is arranged between every two adjacent protective fences, air bags are arranged on the upper end face of the platform, the protective fences and the protective cloth, a gas generator is arranged in the platform, and the air bags are inflated through expansion of the gas generator. The bottom of the platform is connected with a spherical base, and a buffering mechanism and a generating device are arranged in the spherical base. The gas generator is started through a generating device; and an effective protection effect can be achieved, and personnel injury is avoided.
本发明涉及一种高层建筑施工爬架爬升系统,包括爬架主体,所述爬架主体竖直设置在底座上端面,所述爬架主体设有两个升降槽,所述爬架主体的底部设有驱动槽,所述驱动槽内设有驱动机构,所述爬架主体前端设置有站台,所述站台的后侧壁上端固定连接有两个对称设置的固定板,所述固定板配合驱动机构在升降槽内滑动;所述站台上端面四周均布设有防护栏,相邻所述防护栏间设置有防护布,站台上端面、防护栏和防护布上均设置有气囊,所述站台内部设置有气体发生器,气囊通过气体发生器膨胀充气;所述站台底部连接有球状底座,所述球状底座内部设置有缓冲机构和发生装置;所述气体发生器通过发生装置启动;能够起到有效的防护效果,避免人员受伤。
Climbing system of high-rise building construction climbing frame
The invention relates to a high-rise building construction climbing frame climbing system which comprises a climbing frame body, the climbing frame body is vertically arranged on the upper end face of a base, two lifting grooves are formed in the climbing frame body, a driving groove is formed in the bottom of the climbing frame body, a driving mechanism is arranged in the driving groove, and a platform is arranged at the front end of the climbing frame body. The upper end of the rear side wall of the platform is fixedly connected with two symmetrically-arranged fixing plates, and the fixing plates are matched with the driving mechanism to slide in the lifting groove. Protective fences are evenly distributed on the periphery of the upper end face of the platform, protective cloth is arranged between every two adjacent protective fences, air bags are arranged on the upper end face of the platform, the protective fences and the protective cloth, a gas generator is arranged in the platform, and the air bags are inflated through expansion of the gas generator. The bottom of the platform is connected with a spherical base, and a buffering mechanism and a generating device are arranged in the spherical base. The gas generator is started through a generating device; and an effective protection effect can be achieved, and personnel injury is avoided.
本发明涉及一种高层建筑施工爬架爬升系统,包括爬架主体,所述爬架主体竖直设置在底座上端面,所述爬架主体设有两个升降槽,所述爬架主体的底部设有驱动槽,所述驱动槽内设有驱动机构,所述爬架主体前端设置有站台,所述站台的后侧壁上端固定连接有两个对称设置的固定板,所述固定板配合驱动机构在升降槽内滑动;所述站台上端面四周均布设有防护栏,相邻所述防护栏间设置有防护布,站台上端面、防护栏和防护布上均设置有气囊,所述站台内部设置有气体发生器,气囊通过气体发生器膨胀充气;所述站台底部连接有球状底座,所述球状底座内部设置有缓冲机构和发生装置;所述气体发生器通过发生装置启动;能够起到有效的防护效果,避免人员受伤。
Climbing system of high-rise building construction climbing frame
一种高层建筑施工爬架爬升系统
WANG YAO (author) / XU HONGGUANG (author) / ZHANG FENG (author) / HUANG XIA (author) / KIM KWAN-NAM (author) / CHEN XIAOMING (author)
2023-11-28
Patent
Electronic Resource
Chinese
Safe intelligent climbing frame for high-rise building construction
European Patent Office | 2021
|Climbing frame fixing structure and building construction climbing frame
European Patent Office | 2023
|