A platform for research: civil engineering, architecture and urbanism
Hanging bracket structure for framing concrete bridge erection pipeline
The invention discloses a hanging bracket structure for framing concrete bridge erection pipelines, which comprises embedded seamless steel pipe frameworks, hanging bracket upper vertical rods and hanging bracket lower vertical rods which are symmetrically arranged, and the embedded seamless steel pipe frameworks comprise upper embedded steel plates, lower embedded steel plates, embedded steel bars and seamless steel pipes; a plurality of embedded steel bars are arranged between the upper embedded steel plate and the lower embedded steel plate, and seamless steel pipes are arranged between the embedded steel bars located in the middle. The lower pre-embedded steel plate is connected with the top of the hanging bracket upper vertical rod, the bottom of the hanging bracket upper vertical rod is connected with the top of the hanging bracket lower vertical rod, the bottom of the hanging bracket lower vertical rod is connected with the hanging bracket cross beam through a lug plate, and pipeline supports are symmetrically arranged on the hanging bracket cross beam. The hanging bracket structure does not need to additionally increase the width of a bridge flange plate, and has the advantages of being good in landscape effect, convenient to install, reasonable in stress, convenient to operate, replace and maintain and the like.
本发明公开了一种分幅混凝土桥梁架设管线的吊架结构,包括对称设置的预埋无缝钢管骨架、吊架上竖杆、吊架下竖杆,所述预埋无缝钢管骨架包括上预埋钢板、下预埋钢板、预埋钢筋和无缝钢管,所述上预埋钢板与下预埋钢板之间设有多个预埋钢筋,位于中部的预埋钢筋之间设有无缝钢管;所述下预埋钢板与吊架上竖杆顶部连接,所述吊架上竖杆底部与吊架下竖杆顶部连接,所述吊架下竖杆底部通过耳板与吊架横梁相连,该吊架横梁上对称设有管线支座。本发明的吊架结构不需要额外增加桥梁翼缘板宽度,具有景观效果好、安装方便、受力合理,方便运营更换及维修等特点。
Hanging bracket structure for framing concrete bridge erection pipeline
The invention discloses a hanging bracket structure for framing concrete bridge erection pipelines, which comprises embedded seamless steel pipe frameworks, hanging bracket upper vertical rods and hanging bracket lower vertical rods which are symmetrically arranged, and the embedded seamless steel pipe frameworks comprise upper embedded steel plates, lower embedded steel plates, embedded steel bars and seamless steel pipes; a plurality of embedded steel bars are arranged between the upper embedded steel plate and the lower embedded steel plate, and seamless steel pipes are arranged between the embedded steel bars located in the middle. The lower pre-embedded steel plate is connected with the top of the hanging bracket upper vertical rod, the bottom of the hanging bracket upper vertical rod is connected with the top of the hanging bracket lower vertical rod, the bottom of the hanging bracket lower vertical rod is connected with the hanging bracket cross beam through a lug plate, and pipeline supports are symmetrically arranged on the hanging bracket cross beam. The hanging bracket structure does not need to additionally increase the width of a bridge flange plate, and has the advantages of being good in landscape effect, convenient to install, reasonable in stress, convenient to operate, replace and maintain and the like.
本发明公开了一种分幅混凝土桥梁架设管线的吊架结构,包括对称设置的预埋无缝钢管骨架、吊架上竖杆、吊架下竖杆,所述预埋无缝钢管骨架包括上预埋钢板、下预埋钢板、预埋钢筋和无缝钢管,所述上预埋钢板与下预埋钢板之间设有多个预埋钢筋,位于中部的预埋钢筋之间设有无缝钢管;所述下预埋钢板与吊架上竖杆顶部连接,所述吊架上竖杆底部与吊架下竖杆顶部连接,所述吊架下竖杆底部通过耳板与吊架横梁相连,该吊架横梁上对称设有管线支座。本发明的吊架结构不需要额外增加桥梁翼缘板宽度,具有景观效果好、安装方便、受力合理,方便运营更换及维修等特点。
Hanging bracket structure for framing concrete bridge erection pipeline
一种分幅混凝土桥梁架设管线的吊架结构
QI WEICHAO (author) / QIN HUI (author) / LI BOQIANG (author) / GENG TIESUO (author)
2023-12-01
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Seohae Bridge Starter Erection without Pier Bracket
British Library Conference Proceedings | 2001
|British Library Conference Proceedings | 2001
|Middle support bracket system of bridge girder erection machine
European Patent Office | 2022
|