Compartment structure of nuclear island steam generator and installation method of compartment structure
The invention discloses a compartment structure of a nuclear island steam generator and an installation method of the compartment structure. The installation method comprises the following steps that a base is buried in the ground of an assembling area outside a nuclear island; providing a plurality of arc-shaped sub-modules and a plurality of vertical sub-modules; the multiple arc-shaped sub-modules and the multiple vertical sub-modules are hoisted to the base, the multiple arc-shaped sub-modules are spliced in the vertical direction to form an arc-shaped wall of the compartment structure, and the multiple vertical sub-modules are spliced at the two ends of the arc-shaped wall to form two plane walls; the two plane walls and the arc-shaped wall are connected to form a hollow wall body, pouring cavities are formed in the hollow wall body, and the two plane walls and the arc-shaped wall are connected to form a hollow wall body; and the hollow wall body is hoisted and installed in the installation area in the nuclear island, and concrete is poured into all the pouring cavities in the hollow wall body to form the compartment structure. The installation time of the compartment structure is shortened, the installation efficiency is improved, and the installation difficulty is reduced.
本发明公开了一种核岛蒸汽发生器的隔间结构及其安装方法,包括如下步骤:核岛外的拼装区域的地面上埋设底座;提供多个弧形子模块和多个竖直子模块;分别将多个所述弧形子模块和多个所述竖直子模块吊装至所述底座上,并沿着竖直方向将多个所述弧形子模块拼装形成所述隔间结构的弧形墙,并在所述弧形墙的两端均沿拼装多个竖直子模块形成两个平面墙,两个所述平面墙和所述弧形墙连接形成空心墙体形墙内均形成有浇筑腔,两个所述平面墙和所述弧形墙连接形成空心墙体;将所述空心墙体吊装并安装于所述核岛内的安装区域,向空心墙体内的各浇筑腔内浇筑混凝土以形成所述隔间结构。本发明缩短了隔间结构的安装时间,提高了安装效率,降低了安装难度。
Compartment structure of nuclear island steam generator and installation method of compartment structure
The invention discloses a compartment structure of a nuclear island steam generator and an installation method of the compartment structure. The installation method comprises the following steps that a base is buried in the ground of an assembling area outside a nuclear island; providing a plurality of arc-shaped sub-modules and a plurality of vertical sub-modules; the multiple arc-shaped sub-modules and the multiple vertical sub-modules are hoisted to the base, the multiple arc-shaped sub-modules are spliced in the vertical direction to form an arc-shaped wall of the compartment structure, and the multiple vertical sub-modules are spliced at the two ends of the arc-shaped wall to form two plane walls; the two plane walls and the arc-shaped wall are connected to form a hollow wall body, pouring cavities are formed in the hollow wall body, and the two plane walls and the arc-shaped wall are connected to form a hollow wall body; and the hollow wall body is hoisted and installed in the installation area in the nuclear island, and concrete is poured into all the pouring cavities in the hollow wall body to form the compartment structure. The installation time of the compartment structure is shortened, the installation efficiency is improved, and the installation difficulty is reduced.
本发明公开了一种核岛蒸汽发生器的隔间结构及其安装方法,包括如下步骤:核岛外的拼装区域的地面上埋设底座;提供多个弧形子模块和多个竖直子模块;分别将多个所述弧形子模块和多个所述竖直子模块吊装至所述底座上,并沿着竖直方向将多个所述弧形子模块拼装形成所述隔间结构的弧形墙,并在所述弧形墙的两端均沿拼装多个竖直子模块形成两个平面墙,两个所述平面墙和所述弧形墙连接形成空心墙体形墙内均形成有浇筑腔,两个所述平面墙和所述弧形墙连接形成空心墙体;将所述空心墙体吊装并安装于所述核岛内的安装区域,向空心墙体内的各浇筑腔内浇筑混凝土以形成所述隔间结构。本发明缩短了隔间结构的安装时间,提高了安装效率,降低了安装难度。
Compartment structure of nuclear island steam generator and installation method of compartment structure
核岛蒸汽发生器的隔间结构及其安装方法
SHEN TAO (author) / TENG HONGWEN (author) / MING WENBING (author) / LIU YANG (author) / WANG KANG (author) / WANG XIONG (author) / DENG LIANGWEN (author)
2023-12-01
Patent
Electronic Resource
Chinese
Compartment structure of nuclear island steam generator and forming method of compartment structure
European Patent Office | 2023
|COMPARTMENT PENETRATING STRUCTURE, COMPARTMENT PENETRATING MEMBER AND COMPARTMENT PENETRATING METHOD
European Patent Office | 2024
|COMPARTMENT PENETRATING STRUCTURE, COMPARTMENT PENETRATING MEMBER AND COMPARTMENT PENETRATING METHOD
European Patent Office | 2024
|COMPARTMENT PENETRATING STRUCTURE, COMPARTMENT PENETRATING MEMBER AND COMPARTMENT PENETRATING METHOD
European Patent Office | 2021
|