A platform for research: civil engineering, architecture and urbanism
Water conservancy project waterproof slope construction method
The invention discloses a water conservancy project waterproof slope construction method which comprises the following steps: step 1, acquiring basic data of a slope to be constructed, and processing the acquired basic data; 2, importing the processed basic data into a slope construction simulation model for visual display, and trimming parameters to adjust a display effect so as to determine a final construction scheme; 3, according to the simulated and displayed construction scheme, the slope is excavated and supported, and cleaning and stage treatment are conducted; fourthly, waterproof paint is coated on the constructed side slope in a prime coating mode; the method has the beneficial effects that the processed basic data are imported into the slope construction simulation model for visual display, and the parameter adjustment display effect can be trimmed, so that a final construction scheme is determined; construction is carried out according to the construction scheme displayed in a simulation mode, when an emergency occurs, treatment is carried out in time, the construction progress is accelerated, and the construction quality is ensured.
本发明公开了一种水利工程防水边坡施工方法,所述施工方法如下:步骤一:采集待施工边坡的基础数据,并对采集的基础数据进行处理;步骤二:处理后的基础数据导入到边坡施工模拟模型中进行可视化展示,并可修整参数调节展示效果,从而确定最终的施工方案;步骤三:根据模拟展示的施工方案,对边坡进行开挖、支护,并进行清理和级台处理;步骤四:在施工的边坡上底涂防水涂料;本发明的有益效果是:处理后的基础数据导入到边坡施工模拟模型中进行可视化展示,并可修整参数调节展示效果,从而确定最终的施工方案;根据模拟展示的施工方案进行施工,在遇到突发情况时,及时进行处理,提高施工的进度,确保施工的质量。
Water conservancy project waterproof slope construction method
The invention discloses a water conservancy project waterproof slope construction method which comprises the following steps: step 1, acquiring basic data of a slope to be constructed, and processing the acquired basic data; 2, importing the processed basic data into a slope construction simulation model for visual display, and trimming parameters to adjust a display effect so as to determine a final construction scheme; 3, according to the simulated and displayed construction scheme, the slope is excavated and supported, and cleaning and stage treatment are conducted; fourthly, waterproof paint is coated on the constructed side slope in a prime coating mode; the method has the beneficial effects that the processed basic data are imported into the slope construction simulation model for visual display, and the parameter adjustment display effect can be trimmed, so that a final construction scheme is determined; construction is carried out according to the construction scheme displayed in a simulation mode, when an emergency occurs, treatment is carried out in time, the construction progress is accelerated, and the construction quality is ensured.
本发明公开了一种水利工程防水边坡施工方法,所述施工方法如下:步骤一:采集待施工边坡的基础数据,并对采集的基础数据进行处理;步骤二:处理后的基础数据导入到边坡施工模拟模型中进行可视化展示,并可修整参数调节展示效果,从而确定最终的施工方案;步骤三:根据模拟展示的施工方案,对边坡进行开挖、支护,并进行清理和级台处理;步骤四:在施工的边坡上底涂防水涂料;本发明的有益效果是:处理后的基础数据导入到边坡施工模拟模型中进行可视化展示,并可修整参数调节展示效果,从而确定最终的施工方案;根据模拟展示的施工方案进行施工,在遇到突发情况时,及时进行处理,提高施工的进度,确保施工的质量。
Water conservancy project waterproof slope construction method
一种水利工程防水边坡施工方法
MENG LONG (author) / ZHANG WENHAO (author) / XU WENTONG (author)
2023-12-05
Patent
Electronic Resource
Chinese
Water conservancy project waterproof roll construction method
European Patent Office | 2023
|Waterproof construction method for water conservancy project
European Patent Office | 2022
|Waterproof construction method for water conservancy project
European Patent Office | 2020
|Water conservancy project waterproof roll construction method
European Patent Office | 2021
|Water conservancy project construction waterproof drainage device
European Patent Office | 2021
|