A platform for research: civil engineering, architecture and urbanism
Water plugging method for slope adit of strip mine pit
The invention discloses a strip mine pit slope footrill water plugging method, and belongs to the technical field of mine field facilities, and the strip mine pit slope footrill water plugging method comprehensively adopts multiple measures such as a retaining wall, waterproof cloth, a dike dam and a plant ecosystem to ensure that an excellent waterproof effect is achieved under extreme hydrological conditions. By means of engineering means such as bearing columns, pile foundations and anchoring treatment, the stability of the footrill structure is enhanced, the potential risks of geological landslide and soil settlement are reduced, the sustainability and safety of a mine pit slope are ensured, and amphibious plants adopted in the method not only play a role in water prevention, but also play a role in water prevention. In addition, an important habitat is provided for an ecological system, vegetation coverage and a wild animal and plant habitat are improved, ecological restoration and protection are facilitated, the construction cost of the whole scheme is low, follow-up maintenance operation is not needed, and the construction flexibility is high.
本发明公开了一种露天矿坑边坡平硐堵水方法,属于矿场设施技术领域,该露天矿坑边坡平硐堵水方法综合采用挡墙、防水布、护堤和植物生态系统等多层次措施,以确保在极端水文条件下实现卓越的防水效果,有效减少水分入侵和土壤侵蚀风险,过承重柱、桩基和锚固处理等工程手段,增强了平硐结构的稳定性,减少了地质滑坡和土壤沉降的潜在风险,确保了矿坑边坡的可持续性和安全性,方法中采用的水陆两生植物,不仅在防水方面发挥作用,还为生态系统提供了重要的生境,改善了植被覆盖和野生动植物栖息地,有益于生态恢复和保护,整体方案的施工成本较低,且无需后续的维护作业,施工灵活性高。
Water plugging method for slope adit of strip mine pit
The invention discloses a strip mine pit slope footrill water plugging method, and belongs to the technical field of mine field facilities, and the strip mine pit slope footrill water plugging method comprehensively adopts multiple measures such as a retaining wall, waterproof cloth, a dike dam and a plant ecosystem to ensure that an excellent waterproof effect is achieved under extreme hydrological conditions. By means of engineering means such as bearing columns, pile foundations and anchoring treatment, the stability of the footrill structure is enhanced, the potential risks of geological landslide and soil settlement are reduced, the sustainability and safety of a mine pit slope are ensured, and amphibious plants adopted in the method not only play a role in water prevention, but also play a role in water prevention. In addition, an important habitat is provided for an ecological system, vegetation coverage and a wild animal and plant habitat are improved, ecological restoration and protection are facilitated, the construction cost of the whole scheme is low, follow-up maintenance operation is not needed, and the construction flexibility is high.
本发明公开了一种露天矿坑边坡平硐堵水方法,属于矿场设施技术领域,该露天矿坑边坡平硐堵水方法综合采用挡墙、防水布、护堤和植物生态系统等多层次措施,以确保在极端水文条件下实现卓越的防水效果,有效减少水分入侵和土壤侵蚀风险,过承重柱、桩基和锚固处理等工程手段,增强了平硐结构的稳定性,减少了地质滑坡和土壤沉降的潜在风险,确保了矿坑边坡的可持续性和安全性,方法中采用的水陆两生植物,不仅在防水方面发挥作用,还为生态系统提供了重要的生境,改善了植被覆盖和野生动植物栖息地,有益于生态恢复和保护,整体方案的施工成本较低,且无需后续的维护作业,施工灵活性高。
Water plugging method for slope adit of strip mine pit
一种露天矿坑边坡平硐堵水方法
ZHAO SHIYU (author)
2023-12-05
Patent
Electronic Resource
Chinese
Small-section construction adit plugging structure and construction method thereof
European Patent Office | 2015
|Water diversion adit aluminum mold and assembling method
European Patent Office | 2021
|Strip mine pit large-water-inflow spring hole group water plugging method
European Patent Office | 2024
|