A platform for research: civil engineering, architecture and urbanism
Hose clamping structure and working machine
The hose clamping structure is provided with: a vertical plate (49) having an opening (53); a groove section (50) that is provided adjacent to the opening section (53) on a back surface (49f) side on one side of the plate surface parallel direction (W1) with respect to the opening section (53) of the vertical plate (49), and that opens toward the opening section (53) side in the plate surface parallel direction (W1); a receiving part (51) provided on the back surface (49f) side of the other side in the plate surface parallel direction (W1) with respect to the opening part (53) of the vertical plate (49); a first clamping member (58) inserted into the groove portion (50); a second clamping member (59) which is formed of an elastic member, is disposed so as to abut against the receiving section (51) from the front surface side of the vertical plate (49) via the opening (53) in a state where the first clamping member (58) is inserted into the groove section (50), and clamps, together with the first clamping member (58), the hose (45) inserted through the opening (53); and a pressing member (48) attached to the vertical plate (49) so as to press the first clamping member (58) by the second clamping member (59) by elastically deforming the second clamping member (59) by pressing the second clamping member (59) from the front side of the vertical plate (49).
软管夹紧结构具备:纵板(49),具有开口部(53);槽部(50),相对于纵板(49)的开口部(53)在板面平行方向(W1)的一侧的背面(49f)侧与开口部(53)相邻地设置,且在板面平行方向(W1)上向开口部(53)侧开放;承接部(51),相对于纵板(49)的开口部(53)设置在板面平行方向(W1)的另一侧的背面(49f)侧;第一夹紧构件(58),插入槽部(50);第二夹紧构件(59),由弹性构件形成,以在第一夹紧构件(58)插入槽部(50)的状态下从纵板(49)的正面侧经由开口部(53)而与承接部(51)抵接的方式配置且与第一夹紧构件(58)一起夹持插通开口部(53)的软管(45);以及按压构件(48),安装于纵板(49),以便通过从纵板(49)的正面侧按压第二夹紧构件(59)来使其弹性变形,从而由该第二夹紧构件(59)按压第一夹紧构件(58)。
Hose clamping structure and working machine
The hose clamping structure is provided with: a vertical plate (49) having an opening (53); a groove section (50) that is provided adjacent to the opening section (53) on a back surface (49f) side on one side of the plate surface parallel direction (W1) with respect to the opening section (53) of the vertical plate (49), and that opens toward the opening section (53) side in the plate surface parallel direction (W1); a receiving part (51) provided on the back surface (49f) side of the other side in the plate surface parallel direction (W1) with respect to the opening part (53) of the vertical plate (49); a first clamping member (58) inserted into the groove portion (50); a second clamping member (59) which is formed of an elastic member, is disposed so as to abut against the receiving section (51) from the front surface side of the vertical plate (49) via the opening (53) in a state where the first clamping member (58) is inserted into the groove section (50), and clamps, together with the first clamping member (58), the hose (45) inserted through the opening (53); and a pressing member (48) attached to the vertical plate (49) so as to press the first clamping member (58) by the second clamping member (59) by elastically deforming the second clamping member (59) by pressing the second clamping member (59) from the front side of the vertical plate (49).
软管夹紧结构具备:纵板(49),具有开口部(53);槽部(50),相对于纵板(49)的开口部(53)在板面平行方向(W1)的一侧的背面(49f)侧与开口部(53)相邻地设置,且在板面平行方向(W1)上向开口部(53)侧开放;承接部(51),相对于纵板(49)的开口部(53)设置在板面平行方向(W1)的另一侧的背面(49f)侧;第一夹紧构件(58),插入槽部(50);第二夹紧构件(59),由弹性构件形成,以在第一夹紧构件(58)插入槽部(50)的状态下从纵板(49)的正面侧经由开口部(53)而与承接部(51)抵接的方式配置且与第一夹紧构件(58)一起夹持插通开口部(53)的软管(45);以及按压构件(48),安装于纵板(49),以便通过从纵板(49)的正面侧按压第二夹紧构件(59)来使其弹性变形,从而由该第二夹紧构件(59)按压第一夹紧构件(58)。
Hose clamping structure and working machine
软管夹紧结构及作业机
HATTA KAZUYUKI (author)
2023-12-05
Patent
Electronic Resource
Chinese
IPC:
E02F
Baggern
,
DREDGING
INSTALLATION STRUCTURE OF ELECTRIC COMPONENT AND HYDRAULIC HOSE FOR WORKING MACHINE
European Patent Office | 2021
|