Combined traffic organization for overground structure construction and construction method thereof
The invention relates to a combined traffic organization for ground structure construction and a construction method thereof.The combined traffic organization is arranged at a group pit, the group pit is formed by arranging at least three foundation pits in a straight line, and the combined traffic organization comprises a construction road surrounding one long side and two short sides of the group pit; the two sections of trestles reserved by the two foundation pits at the opposite outer ends are both located on the other long side of the group pit and connected to the two ends of the construction road correspondingly; the longitudinal temporary road is formed by a basement structure top plate located between the two sections of trestles, and the two ends of the longitudinal temporary road are connected to the two sections of trestles respectively; the basement structure top plates located between the adjacent foundation pits form at least one transverse temporary road, and the two ends of each transverse temporary road are connected to the longitudinal temporary road and the construction road correspondingly. The underground structure top plate and the trestle are matched with the construction road to form a crossed closed-loop combined traffic organization, so that equipment transportation is more convenient and deeper, and the construction efficiency is high.
本发明涉及一种用于地上结构施工的组合式交通组织及其施工方法,组合式交通组织设在群坑处,群坑由至少三个基坑呈一字型排列而成,组合式交通组织包括:围设于群坑的一长边侧和两短边侧的施工道路;相对外端的两个基坑所预留的两段栈桥,均位于群坑的另一长边侧,且分别连接于施工道路的两端;以及,由位于两段栈桥之间的地下室结构顶板形成的纵向临时道路,纵向临时道路的两端分别连接于两段栈桥;由位于相邻基坑之间的地下室结构顶板形成的至少一条横向临时道路,每条横向临时道路的两端分别连接于纵向临时道路和施工道路。本发明通过地下结构顶板和栈桥配合施工道路形成交叉闭环的组合式交通组织,使得设备运输更便利且更深入,施工效率高。
Combined traffic organization for overground structure construction and construction method thereof
The invention relates to a combined traffic organization for ground structure construction and a construction method thereof.The combined traffic organization is arranged at a group pit, the group pit is formed by arranging at least three foundation pits in a straight line, and the combined traffic organization comprises a construction road surrounding one long side and two short sides of the group pit; the two sections of trestles reserved by the two foundation pits at the opposite outer ends are both located on the other long side of the group pit and connected to the two ends of the construction road correspondingly; the longitudinal temporary road is formed by a basement structure top plate located between the two sections of trestles, and the two ends of the longitudinal temporary road are connected to the two sections of trestles respectively; the basement structure top plates located between the adjacent foundation pits form at least one transverse temporary road, and the two ends of each transverse temporary road are connected to the longitudinal temporary road and the construction road correspondingly. The underground structure top plate and the trestle are matched with the construction road to form a crossed closed-loop combined traffic organization, so that equipment transportation is more convenient and deeper, and the construction efficiency is high.
本发明涉及一种用于地上结构施工的组合式交通组织及其施工方法,组合式交通组织设在群坑处,群坑由至少三个基坑呈一字型排列而成,组合式交通组织包括:围设于群坑的一长边侧和两短边侧的施工道路;相对外端的两个基坑所预留的两段栈桥,均位于群坑的另一长边侧,且分别连接于施工道路的两端;以及,由位于两段栈桥之间的地下室结构顶板形成的纵向临时道路,纵向临时道路的两端分别连接于两段栈桥;由位于相邻基坑之间的地下室结构顶板形成的至少一条横向临时道路,每条横向临时道路的两端分别连接于纵向临时道路和施工道路。本发明通过地下结构顶板和栈桥配合施工道路形成交叉闭环的组合式交通组织,使得设备运输更便利且更深入,施工效率高。
Combined traffic organization for overground structure construction and construction method thereof
用于地上结构施工的组合式交通组织及其施工方法
LIU YINGLONG (author) / WANG PENG (author) / CAO CHUANWEI (author) / ZHANG YONGHUAN (author) / ZHOU ERDAN (author) / WANG FANGLIANG (author) / CHEN WENJIE (author) / GAO NING (author) / FAN CHUANBO (author) / FENG ZHENSHUO (author)
2023-12-08
Patent
Electronic Resource
Chinese
Overground outer wall anti-seepage structure and construction method
European Patent Office | 2023
|European Patent Office | 2021
|Construction method for additionally constructing overground parking garage
European Patent Office | 2021
|Rapid starting building construction method for overground structure of super high-rise building
European Patent Office | 2024
|Environment-friendly blockage-removing overground traffic structure in city
European Patent Office | 2022