A platform for research: civil engineering, architecture and urbanism
Large basement outer wall waterproof and drainage integrated structure based on BIM
The BIM-based large basement outer wall waterproof and drainage integrated structure comprises an outer wall and a foundation, a support is arranged between the outer wall and the foundation, a plurality of water pipes are connected to the outer wall, a gap is formed between the outer wall and the foundation, and a first crushing mechanism is installed in the gap; and one ends of the multiple water pipes communicate with a first crushing mechanism, the first crushing mechanism comprises a shell, a first cutting knife is installed in the shell in a sliding mode, and second cutting knives are symmetrically arranged on the two sides of the first cutting knife. When sewage exists in the outer wall, the sewage carries impurities, the sewage mixed with the impurities flows into the first crushing mechanism along the water pipe, and the first crushing mechanism can cut and crush the impurities in the sewage, so that the sewage can be smoothly discharged.
本发明公开了一种基于BIM的大型地下室外墙防水排水集成结构,外墙和地基,所述外墙和地基之间设置有支架,所述外墙上连接有多个水管,所述外墙和地基之间形成有间隙,所述间隙内安装有第一破碎机构,多个所述水管的一端与第一破碎机构连通,所述第一破碎机构包括外壳,所述外壳内滑动安装有第一切割刀,所述第一切割刀的两侧对称设置有第二切割刀。当外墙内存在污水的时候,污水中会携带有杂质,掺和杂质的污水将会顺着水管流淌到第一破碎机构内,第一破碎机构可以对污水中的杂质进行切割破碎,从而使得污水能够顺利的排放出去。
Large basement outer wall waterproof and drainage integrated structure based on BIM
The BIM-based large basement outer wall waterproof and drainage integrated structure comprises an outer wall and a foundation, a support is arranged between the outer wall and the foundation, a plurality of water pipes are connected to the outer wall, a gap is formed between the outer wall and the foundation, and a first crushing mechanism is installed in the gap; and one ends of the multiple water pipes communicate with a first crushing mechanism, the first crushing mechanism comprises a shell, a first cutting knife is installed in the shell in a sliding mode, and second cutting knives are symmetrically arranged on the two sides of the first cutting knife. When sewage exists in the outer wall, the sewage carries impurities, the sewage mixed with the impurities flows into the first crushing mechanism along the water pipe, and the first crushing mechanism can cut and crush the impurities in the sewage, so that the sewage can be smoothly discharged.
本发明公开了一种基于BIM的大型地下室外墙防水排水集成结构,外墙和地基,所述外墙和地基之间设置有支架,所述外墙上连接有多个水管,所述外墙和地基之间形成有间隙,所述间隙内安装有第一破碎机构,多个所述水管的一端与第一破碎机构连通,所述第一破碎机构包括外壳,所述外壳内滑动安装有第一切割刀,所述第一切割刀的两侧对称设置有第二切割刀。当外墙内存在污水的时候,污水中会携带有杂质,掺和杂质的污水将会顺着水管流淌到第一破碎机构内,第一破碎机构可以对污水中的杂质进行切割破碎,从而使得污水能够顺利的排放出去。
Large basement outer wall waterproof and drainage integrated structure based on BIM
一种基于BIM的大型地下室外墙防水排水集成结构
ZHAO MING (author) / HU YI (author) / LIU KAI (author) / ZHANG JIANFENG (author) / YUE YACHAO (author)
2023-12-08
Patent
Electronic Resource
Chinese
Basement outer wall waterproof step type drainage integrated structure and construction method
European Patent Office | 2023
|Basement waterproof and drainage outer wall structure and construction method thereof
European Patent Office | 2024
|Basement outer wall expansion joint waterproof structure
European Patent Office | 2021
|Basement exterior wall waterproof and drainage integrated structure and method
European Patent Office | 2022
|European Patent Office | 2024
|