A platform for research: civil engineering, architecture and urbanism
Multi-lock-catch installation design structure of light steel keel suspended ceiling
The multi-lock-catch installation design structure comprises an auxiliary keel and a main keel clamped to the auxiliary keel through a first lock catch unit and a second lock catch unit, the main keel is sleeved with a third lock catch unit, and the upper end of the third lock catch unit is hung on the top of a wall through a hanging rod. In the first lock catch unit, the buckles are inserted into different auxiliary keels at intervals to be matched with the trapezoidal side plates and the clamping hooks which are oppositely arranged, so that when the suspended ceiling shakes due to external vibration, the displacement in the keel structure is reduced, the suspended ceiling mounting structure is more integrated, higher anti-seismic, noise-reducing and load-bearing performance is achieved, and the service life of the suspended ceiling is prolonged. Through the inclined meshing guiding effect of a third buckle piece and a gear in the second lock catch unit, stretching and retracting of the third buckle piece are achieved, clamping connection between the third buckle piece and an auxiliary keel is more stable, the extending length of the third buckle piece is adjustable, keel structure assembling distance adjustment is achieved, assembling construction is easy, convenient and rapid, and the ceiling assembling structure strength is stable.
本发明公开了一种轻钢龙骨吊顶的多锁扣安装设计结构,包括副龙骨和通过第一锁扣单元、第二锁扣单元卡接在副龙骨上的主龙骨,主龙骨上套设有第三锁扣单元,第三锁扣单元上端通过吊杆吊装在墙面顶部,本发明的第一锁扣单元中卡扣件间隔插入不同副龙骨内配合相对设置的梯形侧板和卡钩,使得吊顶受外界振动而晃动时,使得龙骨结构内位移减小,吊顶安装结构更加整体化,具有更强的抗震、降噪以及承重性能,第二锁扣单元中第三卡扣件与齿轮的倾斜啮合导向作用,实现第三卡扣件的伸缩,使其与副龙骨的卡接更加稳定,第三卡扣件伸出长度可调,实现龙骨结构装配间距调整,装配施工简便,快速,吊顶装配结构强度稳定。
Multi-lock-catch installation design structure of light steel keel suspended ceiling
The multi-lock-catch installation design structure comprises an auxiliary keel and a main keel clamped to the auxiliary keel through a first lock catch unit and a second lock catch unit, the main keel is sleeved with a third lock catch unit, and the upper end of the third lock catch unit is hung on the top of a wall through a hanging rod. In the first lock catch unit, the buckles are inserted into different auxiliary keels at intervals to be matched with the trapezoidal side plates and the clamping hooks which are oppositely arranged, so that when the suspended ceiling shakes due to external vibration, the displacement in the keel structure is reduced, the suspended ceiling mounting structure is more integrated, higher anti-seismic, noise-reducing and load-bearing performance is achieved, and the service life of the suspended ceiling is prolonged. Through the inclined meshing guiding effect of a third buckle piece and a gear in the second lock catch unit, stretching and retracting of the third buckle piece are achieved, clamping connection between the third buckle piece and an auxiliary keel is more stable, the extending length of the third buckle piece is adjustable, keel structure assembling distance adjustment is achieved, assembling construction is easy, convenient and rapid, and the ceiling assembling structure strength is stable.
本发明公开了一种轻钢龙骨吊顶的多锁扣安装设计结构,包括副龙骨和通过第一锁扣单元、第二锁扣单元卡接在副龙骨上的主龙骨,主龙骨上套设有第三锁扣单元,第三锁扣单元上端通过吊杆吊装在墙面顶部,本发明的第一锁扣单元中卡扣件间隔插入不同副龙骨内配合相对设置的梯形侧板和卡钩,使得吊顶受外界振动而晃动时,使得龙骨结构内位移减小,吊顶安装结构更加整体化,具有更强的抗震、降噪以及承重性能,第二锁扣单元中第三卡扣件与齿轮的倾斜啮合导向作用,实现第三卡扣件的伸缩,使其与副龙骨的卡接更加稳定,第三卡扣件伸出长度可调,实现龙骨结构装配间距调整,装配施工简便,快速,吊顶装配结构强度稳定。
Multi-lock-catch installation design structure of light steel keel suspended ceiling
一种轻钢龙骨吊顶的多锁扣安装设计结构
JIN WEIQI (author) / CHEN WANWEI (author) / LI CHUNSONG (author) / HE CHENGWAN (author) / CAO JUN (author) / PEI CHANGZHU (author) / ZHAO WENJUN (author) / ZHOU FUGEN (author) / ZHOU XIANG (author)
2023-12-08
Patent
Electronic Resource
Chinese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Lock catch type connection light steel keel suspended ceiling structure and construction method
European Patent Office | 2024
|