A platform for research: civil engineering, architecture and urbanism
Assembled earthwork standard room
The assembled earthwork standard room comprises a mounting block and positioning nails, two fixed inserting blocks and two movable inserting blocks are arranged on the periphery of the mounting block, unit plates are movably inserted into the ends of the two fixed inserting blocks and the ends of the two movable inserting blocks, a movable groove is formed in the middle of the mounting block, and a connecting rod is rotatably inserted into the movable groove; one end of the connecting rod is fixedly connected with one movable inserting block, a clamping block is arranged at the other end of the connecting rod, a clamping groove is formed in the surface of the other movable inserting block, the surface of the positioning nail is movably sleeved with a pushing block, and an inserting groove is formed in the surface of the connecting rod. The connecting rod and the two movable inserting blocks are deflected through rotation of the pushing block, then the angle between the externally-mounted unit plates is adjusted, the structural range of the geocell is changed, meanwhile, the internal structure and the connecting mode of the device are simple, the production cost is reduced, waste is avoided, and the device is more convenient to produce and use.
本发明公开了一种组装式土工格室,包括安装块和定位钉,安装块四周设置有两个固定插块和两个活动插块,两个固定插块与两个活动插块端部均活动插接有单元板,安装块中部开设有活动槽,活动槽内部转动插接有连接杆,连接杆一端与其中一个活动插块固定连接,连接杆一端另一端设置有卡接块,另一个活动插块表面开设有卡接槽,定位钉表面活动套接有推动块,连接杆表面开设有插接槽。利用推动块的旋转将连接杆和两个活动插块偏转,进而调节外装的单元板之间的角度,进而改变土工格室结构范围,同时装置内部结构与连接方式简单,降低生产成本以避免浪费,也更方便对装置进行生产和使用。
Assembled earthwork standard room
The assembled earthwork standard room comprises a mounting block and positioning nails, two fixed inserting blocks and two movable inserting blocks are arranged on the periphery of the mounting block, unit plates are movably inserted into the ends of the two fixed inserting blocks and the ends of the two movable inserting blocks, a movable groove is formed in the middle of the mounting block, and a connecting rod is rotatably inserted into the movable groove; one end of the connecting rod is fixedly connected with one movable inserting block, a clamping block is arranged at the other end of the connecting rod, a clamping groove is formed in the surface of the other movable inserting block, the surface of the positioning nail is movably sleeved with a pushing block, and an inserting groove is formed in the surface of the connecting rod. The connecting rod and the two movable inserting blocks are deflected through rotation of the pushing block, then the angle between the externally-mounted unit plates is adjusted, the structural range of the geocell is changed, meanwhile, the internal structure and the connecting mode of the device are simple, the production cost is reduced, waste is avoided, and the device is more convenient to produce and use.
本发明公开了一种组装式土工格室,包括安装块和定位钉,安装块四周设置有两个固定插块和两个活动插块,两个固定插块与两个活动插块端部均活动插接有单元板,安装块中部开设有活动槽,活动槽内部转动插接有连接杆,连接杆一端与其中一个活动插块固定连接,连接杆一端另一端设置有卡接块,另一个活动插块表面开设有卡接槽,定位钉表面活动套接有推动块,连接杆表面开设有插接槽。利用推动块的旋转将连接杆和两个活动插块偏转,进而调节外装的单元板之间的角度,进而改变土工格室结构范围,同时装置内部结构与连接方式简单,降低生产成本以避免浪费,也更方便对装置进行生产和使用。
Assembled earthwork standard room
一种组装式土工格室
ZHAO SHUANG (author) / CHENG WEI (author)
2023-12-12
Patent
Electronic Resource
Chinese
Earthwork standard room connecting piece and earthwork standard room
European Patent Office | 2023
|Plate for earthwork standard room and stepped earthwork standard room
European Patent Office | 2023
|European Patent Office | 2024
|