A platform for research: civil engineering, architecture and urbanism
Building wall surface green coating construction device
The building wall surface green coating construction device comprises a supporting bottom plate, a vertical conveying channel is arranged on one side of the top of the supporting bottom plate, a coating storage box is arranged on the top of the right side of the vertical conveying channel, and a feeding opening is formed in the top of the right side of the coating storage box; the upper portion of the left side of the coating storage box is in through connection with the interior of the vertical conveying channel through a third discharging port, a conveying mechanism is arranged in the vertical conveying channel, a lifting part is arranged at the top of the vertical conveying channel, and a connecting channel is arranged below the lifting part; a second discharging port is formed between the connecting channel and the bottom of the left side of the vertical conveying channel, a collecting box is arranged on the side, away from the second discharging port, of the connecting channel, a first discharging port is formed between the collecting box and the connecting channel, a material receiving channel is formed in the top of the collecting box, and a discharging channel is arranged above the material receiving channel. The device has the beneficial effects that recycling is achieved, and waste is avoided.
本发明公开了一种建筑墙面绿色涂饰施工装置,包括支撑底板,所述支撑底板的顶部一侧设有竖向输送通道,所述竖向输送通道右侧顶部设有涂料储存箱,所述涂料储存箱右侧顶部设有进料口,所述涂料储存箱左侧上部通过出料口三与所述竖向输送通道内部贯通连接,所述竖向输送通道内设有输送机构,所述竖向输送通道的顶部设有提升部,所述提升部下设有连接通道,所述连接通道与所述竖向输送通道左侧底部之间设有出料口二,所述连接通道远离所述出料口二一侧设有收集箱,所述收集箱与所述连接通道之间设有出料口一,所述收集箱顶部设有接料通道,所述接料通道上方设有下料通道。有益效果:实现回收利用,避免废料浪费。
Building wall surface green coating construction device
The building wall surface green coating construction device comprises a supporting bottom plate, a vertical conveying channel is arranged on one side of the top of the supporting bottom plate, a coating storage box is arranged on the top of the right side of the vertical conveying channel, and a feeding opening is formed in the top of the right side of the coating storage box; the upper portion of the left side of the coating storage box is in through connection with the interior of the vertical conveying channel through a third discharging port, a conveying mechanism is arranged in the vertical conveying channel, a lifting part is arranged at the top of the vertical conveying channel, and a connecting channel is arranged below the lifting part; a second discharging port is formed between the connecting channel and the bottom of the left side of the vertical conveying channel, a collecting box is arranged on the side, away from the second discharging port, of the connecting channel, a first discharging port is formed between the collecting box and the connecting channel, a material receiving channel is formed in the top of the collecting box, and a discharging channel is arranged above the material receiving channel. The device has the beneficial effects that recycling is achieved, and waste is avoided.
本发明公开了一种建筑墙面绿色涂饰施工装置,包括支撑底板,所述支撑底板的顶部一侧设有竖向输送通道,所述竖向输送通道右侧顶部设有涂料储存箱,所述涂料储存箱右侧顶部设有进料口,所述涂料储存箱左侧上部通过出料口三与所述竖向输送通道内部贯通连接,所述竖向输送通道内设有输送机构,所述竖向输送通道的顶部设有提升部,所述提升部下设有连接通道,所述连接通道与所述竖向输送通道左侧底部之间设有出料口二,所述连接通道远离所述出料口二一侧设有收集箱,所述收集箱与所述连接通道之间设有出料口一,所述收集箱顶部设有接料通道,所述接料通道上方设有下料通道。有益效果:实现回收利用,避免废料浪费。
Building wall surface green coating construction device
一种建筑墙面绿色涂饰施工装置
YU FEI (author) / ZHU LIANGLIANG (author) / LI HAILI (author) / WANG ZENGHUI (author)
2023-12-12
Patent
Electronic Resource
Chinese
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
Building wall green coating construction device and construction process thereof
European Patent Office | 2021
|European Patent Office | 2021
|Outer wall surface green coating construction device and process
European Patent Office | 2020
|Safe wall surface cleaning device for green building construction
European Patent Office | 2021
|