Mountainous area complex geological river steel pipe pile guide hole drilling method
The invention relates to a mountainous area complex geological river steel pipe pile guide hole drilling method, which relates to the technical field of steel pipe piles, and comprises the following drilling steps: step 1, mounting a steel pipe pile: positioning the steel pipe pile through a guide device, and then driving the steel pipe pile to be inserted into a roadbed or a river through vibration of a vibration hammer, meanwhile, the guide device is used for guiding and positioning the steel pipe pile until the steel pipe pile is mounted in place; 2, hole guiding, wherein hole guiding and hole cleaning are conducted on a roadbed or a river in the steel pipe pile through a drilling machine; and 3, the steps are repeated to complete construction of the multiple steel pipe pile guide holes. The steel pipe pile and the guiding device are connected together, then the vibratory hammer and the steel pipe pile are connected together, the vibratory hammer vibrates to drive the steel pipe pile to be inserted into the roadbed, and meanwhile the guiding device is used for guiding and positioning the position of the steel pipe pile; after being installed, the steel pipe pile is detached from the vibratory hammer, then the drilling machine is started for hole guiding and hole cleaning, the steel pipe pile can guide subsequent drilling of the drilling machine, and therefore the construction efficiency and quality are improved.
本申请涉及山区复杂地质河流钢管桩引孔施打方法,涉及钢管桩的技术领域,包括以下施打步骤:步骤1:安装钢管桩:通过导向装置对钢管桩进行定位,然后振动锤振动带动钢管桩插入路基或河流中,同时导向装置用于对钢管桩位置进行导向定位,直至安装到位;步骤2:引孔:采用钻机在钢管桩内路基或河流进行引孔和清孔;步骤3:重复以上步骤完成多个钢管桩引孔的施工。本申请通过将钢管桩与导向装置连接在一起,然后将振动锤与钢管桩连接在一起,振动锤振动带动钢管桩插入路基,同时导向装置用于对钢管桩位置进行导向定位;钢管桩安装完成后与振动锤拆开,然后钻机启动进行引孔和清孔,钢管桩能够对后续钻机钻孔进行导向,从而提高了施工效率和质量。
Mountainous area complex geological river steel pipe pile guide hole drilling method
The invention relates to a mountainous area complex geological river steel pipe pile guide hole drilling method, which relates to the technical field of steel pipe piles, and comprises the following drilling steps: step 1, mounting a steel pipe pile: positioning the steel pipe pile through a guide device, and then driving the steel pipe pile to be inserted into a roadbed or a river through vibration of a vibration hammer, meanwhile, the guide device is used for guiding and positioning the steel pipe pile until the steel pipe pile is mounted in place; 2, hole guiding, wherein hole guiding and hole cleaning are conducted on a roadbed or a river in the steel pipe pile through a drilling machine; and 3, the steps are repeated to complete construction of the multiple steel pipe pile guide holes. The steel pipe pile and the guiding device are connected together, then the vibratory hammer and the steel pipe pile are connected together, the vibratory hammer vibrates to drive the steel pipe pile to be inserted into the roadbed, and meanwhile the guiding device is used for guiding and positioning the position of the steel pipe pile; after being installed, the steel pipe pile is detached from the vibratory hammer, then the drilling machine is started for hole guiding and hole cleaning, the steel pipe pile can guide subsequent drilling of the drilling machine, and therefore the construction efficiency and quality are improved.
本申请涉及山区复杂地质河流钢管桩引孔施打方法,涉及钢管桩的技术领域,包括以下施打步骤:步骤1:安装钢管桩:通过导向装置对钢管桩进行定位,然后振动锤振动带动钢管桩插入路基或河流中,同时导向装置用于对钢管桩位置进行导向定位,直至安装到位;步骤2:引孔:采用钻机在钢管桩内路基或河流进行引孔和清孔;步骤3:重复以上步骤完成多个钢管桩引孔的施工。本申请通过将钢管桩与导向装置连接在一起,然后将振动锤与钢管桩连接在一起,振动锤振动带动钢管桩插入路基,同时导向装置用于对钢管桩位置进行导向定位;钢管桩安装完成后与振动锤拆开,然后钻机启动进行引孔和清孔,钢管桩能够对后续钻机钻孔进行导向,从而提高了施工效率和质量。
Mountainous area complex geological river steel pipe pile guide hole drilling method
山区复杂地质河流钢管桩引孔施打方法
WANG ZHILIN (author) / WU HONGWEI (author) / WANG AOLE (author) / SONG JUNJIE (author) / HAN QIUYUE (author) / YIN QUANLAI (author) / KE ZHIXUE (author) / WEI YU (author) / RAO ZHUOHAO (author) / LI YI (author)
2023-12-15
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Steel pipe pile guide hole construction method under deepwater bare rock geological condition
European Patent Office | 2023
|Construction method for mountainous complex terrain geological pile foundation
European Patent Office | 2022
|European Patent Office | 2024
|Steel pipe pile deepwater guide hole pile sinking construction method
European Patent Office | 2023
|European Patent Office | 2024
|