A platform for research: civil engineering, architecture and urbanism
Subway station floor slab high formwork construction monitoring and safety early warning method
The invention provides a construction monitoring and safety early warning method for a floor slab high formwork of a subway station. The method comprises the steps that firstly, construction monitoring and safety early warning monitoring of the floor slab high formwork of the subway station are divided into monitoring of all divided areas and monitoring of an overall structure; then, carrying out engineering mechanical analysis and risk hypothesis evaluation on each divided region and the overall structure of the high-support formwork to respectively obtain a complete life cycle data set capable of representing each divided region and the overall structure; and finally, training the data set through a BP neural network to obtain a model algorithm representing each divided area and the overall structure of the high-support formwork, automatically obtaining high-support formwork real-time data provided by the monitoring equipment through a computer, substituting the real-time data into the corresponding model algorithm, judging whether the data information has risks, and if yes, judging whether the data information has risks or not. Judging whether the high formwork has risks or not; according to the method, automatic, real-time and accurate monitoring of the high formwork is realized.
本发明提出了一种地铁车站楼板高支模施工监控及安全预警方法,该方法包括:该方法首先对地铁车站楼板高支模的施工监控和安全预警监控分为各划分区域监控和整体结构的监控;随后,通过对高支模各划分区域和整体结构进行工程力学分析和风险假设性评估,分别得到能代表各划分区域和整体结构的完整生命周期数据集;最后,通过BP神经网络对数据集进行训练,得到代表高支模各划分区域和整体结构的模型算法,并通过计算机自动获取监测设备提供的高支模实时数据,将实时数据代入对应的模型算法中,判断数据信息是否存在风险,即判断高支模是否存在风险;该方法实现了对高支模自动化、实时和准确性的监控。
Subway station floor slab high formwork construction monitoring and safety early warning method
The invention provides a construction monitoring and safety early warning method for a floor slab high formwork of a subway station. The method comprises the steps that firstly, construction monitoring and safety early warning monitoring of the floor slab high formwork of the subway station are divided into monitoring of all divided areas and monitoring of an overall structure; then, carrying out engineering mechanical analysis and risk hypothesis evaluation on each divided region and the overall structure of the high-support formwork to respectively obtain a complete life cycle data set capable of representing each divided region and the overall structure; and finally, training the data set through a BP neural network to obtain a model algorithm representing each divided area and the overall structure of the high-support formwork, automatically obtaining high-support formwork real-time data provided by the monitoring equipment through a computer, substituting the real-time data into the corresponding model algorithm, judging whether the data information has risks, and if yes, judging whether the data information has risks or not. Judging whether the high formwork has risks or not; according to the method, automatic, real-time and accurate monitoring of the high formwork is realized.
本发明提出了一种地铁车站楼板高支模施工监控及安全预警方法,该方法包括:该方法首先对地铁车站楼板高支模的施工监控和安全预警监控分为各划分区域监控和整体结构的监控;随后,通过对高支模各划分区域和整体结构进行工程力学分析和风险假设性评估,分别得到能代表各划分区域和整体结构的完整生命周期数据集;最后,通过BP神经网络对数据集进行训练,得到代表高支模各划分区域和整体结构的模型算法,并通过计算机自动获取监测设备提供的高支模实时数据,将实时数据代入对应的模型算法中,判断数据信息是否存在风险,即判断高支模是否存在风险;该方法实现了对高支模自动化、实时和准确性的监控。
Subway station floor slab high formwork construction monitoring and safety early warning method
一种地铁车站楼板高支模施工监控及安全预警方法
GUO MINGHUA (author) / RONG JINGSONG (author) / ZHANG KAI (author) / LI XIAO (author) / LUO YUNJIAN (author) / XIA YINGPING (author) / HUANG GUOZHONG (author) / CHEN RISHENG (author) / TANG ZIPENG (author) / ZHU KANG (author)
2023-12-15
Patent
Electronic Resource
Chinese
IPC:
G06F
ELECTRIC DIGITAL DATA PROCESSING
,
Elektrische digitale Datenverarbeitung
/
E04G
SCAFFOLDING
,
Baugerüste
/
G06Q
Datenverarbeitungssysteme oder -verfahren, besonders angepasst an verwaltungstechnische, geschäftliche, finanzielle oder betriebswirtschaftliche Zwecke, sowie an geschäftsbezogene Überwachungs- oder Voraussagezwecke
,
DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES
Floor slab formwork structure and construction method thereof
European Patent Office | 2023
|Prefabricated formwork-free floor slab and construction method
European Patent Office | 2022
|Construction method for erecting double-layer floor slab formwork
European Patent Office | 2024
|Composite floor slab seam formwork construction auxiliary device and construction method
European Patent Office | 2022
|Subway station side wall quick-release formwork system and construction method
European Patent Office | 2024
|