A platform for research: civil engineering, architecture and urbanism
Method for paving cement-stabilized sand-doped laterite aggregates
The invention relates to a method for paving cement-stabilized sand-doped laterite granules. The invention provides the paving method of the cement-stabilized sand-doped red soil aggregate based on the loading machine, the land leveler and the GPS elevation control system, so that a cement-stabilized sand-doped red soil aggregate structure layer after construction is completed is ensured to have better integrity and compactness, and meanwhile, the construction continuity can be ensured; by the adoption of the paving operation method, a good construction effect can be achieved, the defect that large-thickness pavement structure layer construction cannot be completed due to the lack of special equipment can be overcome, the expense for purchasing special equipment can be reduced, and the paving operation method is a construction process with excellent technical economy; and feasible technical guidance can be provided for large-scale construction of similar projects in the African region.
本发明涉及一种水泥稳定掺砂红土粒料的摊铺方法。本发明提出了一种基于装载机、平地机、GPS高程控制系统的水泥稳定掺砂红土粒料的摊铺方法,不仅保证施工完成后的水泥稳定掺砂红土粒料结构层具有较好的整体性和密实性,同时可以保证施工的连续性;采用本发明的摊铺作业方法,能够实现良好的施工效果,可解决由于缺少特殊设备无法完成大厚度路面结构层施工的不足,并可减少购买专用设备的费用支出,是一种技术经济性较优的施工工艺,可为非洲地区同类项目的规模化施工提供切实可行的技术指导。
Method for paving cement-stabilized sand-doped laterite aggregates
The invention relates to a method for paving cement-stabilized sand-doped laterite granules. The invention provides the paving method of the cement-stabilized sand-doped red soil aggregate based on the loading machine, the land leveler and the GPS elevation control system, so that a cement-stabilized sand-doped red soil aggregate structure layer after construction is completed is ensured to have better integrity and compactness, and meanwhile, the construction continuity can be ensured; by the adoption of the paving operation method, a good construction effect can be achieved, the defect that large-thickness pavement structure layer construction cannot be completed due to the lack of special equipment can be overcome, the expense for purchasing special equipment can be reduced, and the paving operation method is a construction process with excellent technical economy; and feasible technical guidance can be provided for large-scale construction of similar projects in the African region.
本发明涉及一种水泥稳定掺砂红土粒料的摊铺方法。本发明提出了一种基于装载机、平地机、GPS高程控制系统的水泥稳定掺砂红土粒料的摊铺方法,不仅保证施工完成后的水泥稳定掺砂红土粒料结构层具有较好的整体性和密实性,同时可以保证施工的连续性;采用本发明的摊铺作业方法,能够实现良好的施工效果,可解决由于缺少特殊设备无法完成大厚度路面结构层施工的不足,并可减少购买专用设备的费用支出,是一种技术经济性较优的施工工艺,可为非洲地区同类项目的规模化施工提供切实可行的技术指导。
Method for paving cement-stabilized sand-doped laterite aggregates
一种水泥稳定掺砂红土粒料的摊铺方法
ZHANG JIANGUO (author) / LIU HAIYAN (author) / LIANG DONGDONG (author) / ZHOU XINGYE (author) / MA JIANMIN (author)
2023-12-19
Patent
Electronic Resource
Chinese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
On-site road mixing construction process of cement-stabilized sand-doped laterite aggregate
European Patent Office | 2023
|Paving operation method for treating laterite granules with large-thickness cement
European Patent Office | 2020
|Compressive Strength of Laterite Stabilized with Cement
Springer Verlag | 2024
|Plant mixing construction process for cement-stabilized sand-doped red soil aggregates
European Patent Office | 2023
|Resilient Response of Mechanical Cement-Stabilized Laterite Gravel
Springer Verlag | 2024
|