Building engineering base and construction method thereof
The invention discloses a building engineering base and a construction method thereof, and relates to the technical field of building construction. A constructional engineering base comprises a tubular pile and a bearing platform connected with the upper end of the tubular pile, mounting holes are formed in the peripheral wall of the tubular pile in the radial direction of the tubular pile, limiting rods are arranged in the mounting holes, and the limiting rods are in sliding connection with the inner side walls of the mounting holes in the length direction of the mounting holes; the end, close to the outer portion of the pipe pile, of the limiting rod can completely retract into the mounting hole, and the pipe pile is provided with a driving piece. After the pipe pile is inserted into a soil layer, the driving piece can drive the limiting rod to move towards the outer portion of the pipe pile. The driving piece can enable the end, close to the exterior of the tubular pile, of the limiting rod to be inserted into a soil layer so as to achieve the effect of limiting the tubular pile from moving downwards, so that the stability of the tubular pile and the bearing platform is improved, the number of the tubular piles is reduced, and the convenience of tubular pile construction operation is improved.
本申请公开了一种建筑工程底座及其施工方法,涉及建筑施工技术领域。一种建筑工程底座,包括管桩和与管桩的上端相连的承台,所述管桩的外周壁沿管桩的径向设置有安装孔,所述安装孔内设置有限位杆,所述限位杆沿安装孔的长度方向与安装孔的内侧壁滑移连接;所述限位杆靠近管桩的外部的一端可完全缩入安装孔内,所述管桩设置有驱动件;所述管桩插入土层后,所述驱动件可驱动限位杆向管桩的外部方向移动。驱动件可使限位杆的靠近管桩的外部的一端插入土层内,以达到限制管桩向下移动的效果,从而增大管桩和承台的稳定性,从而有利于减少管桩的数量,有利于提高管桩施工操作的便捷性。
Building engineering base and construction method thereof
The invention discloses a building engineering base and a construction method thereof, and relates to the technical field of building construction. A constructional engineering base comprises a tubular pile and a bearing platform connected with the upper end of the tubular pile, mounting holes are formed in the peripheral wall of the tubular pile in the radial direction of the tubular pile, limiting rods are arranged in the mounting holes, and the limiting rods are in sliding connection with the inner side walls of the mounting holes in the length direction of the mounting holes; the end, close to the outer portion of the pipe pile, of the limiting rod can completely retract into the mounting hole, and the pipe pile is provided with a driving piece. After the pipe pile is inserted into a soil layer, the driving piece can drive the limiting rod to move towards the outer portion of the pipe pile. The driving piece can enable the end, close to the exterior of the tubular pile, of the limiting rod to be inserted into a soil layer so as to achieve the effect of limiting the tubular pile from moving downwards, so that the stability of the tubular pile and the bearing platform is improved, the number of the tubular piles is reduced, and the convenience of tubular pile construction operation is improved.
本申请公开了一种建筑工程底座及其施工方法,涉及建筑施工技术领域。一种建筑工程底座,包括管桩和与管桩的上端相连的承台,所述管桩的外周壁沿管桩的径向设置有安装孔,所述安装孔内设置有限位杆,所述限位杆沿安装孔的长度方向与安装孔的内侧壁滑移连接;所述限位杆靠近管桩的外部的一端可完全缩入安装孔内,所述管桩设置有驱动件;所述管桩插入土层后,所述驱动件可驱动限位杆向管桩的外部方向移动。驱动件可使限位杆的靠近管桩的外部的一端插入土层内,以达到限制管桩向下移动的效果,从而增大管桩和承台的稳定性,从而有利于减少管桩的数量,有利于提高管桩施工操作的便捷性。
Building engineering base and construction method thereof
一种建筑工程底座及其施工方法
LIANG WENGUANG (author)
2023-12-19
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Engineering board for building construction and construction method thereof
European Patent Office | 2024
|Building reinforcement engineering structure and construction method thereof
European Patent Office | 2023
|Building reinforcement engineering structure and construction method thereof
European Patent Office | 2021
|Building engineering construction equipment and use method thereof
European Patent Office | 2023
|