A platform for research: civil engineering, architecture and urbanism
Concrete maintenance device for building construction
The concrete maintenance device for building construction comprises a base, a water tank is arranged on one side of the top end of the base, a liquid injection opening is formed in the center of the top end of the water tank, the bottom end of the liquid injection opening extends into the water tank, a liquid passing frame is arranged at the position, on one side of the water tank, of the bottom end of the base, and nozzles are installed at the bottom end of the liquid passing frame at equal intervals. A front shaft rod is arranged on one side of the bottom end of the base, front rolling wheels are movably connected to the two ends of the front shaft rod, a rear shaft rod is arranged on the other side of the bottom end of the base, rear rolling wheels are rotationally connected to the two ends of the rear shaft rod, and a solar photovoltaic panel is arranged above the water tank. The purpose of liquid level monitoring is achieved, the phenomenon that maintenance operation is stopped due to exhaustion of a water source in the water tank is reduced, the purpose of solar power supply to the maintenance device is achieved, the energy saving performance of the maintenance device during use is improved, the maintenance device can be conveniently conveyed and transferred, and the maintenance efficiency is improved. The convenience of the maintenance device during concrete floor maintenance is improved.
本发明公开了一种建筑施工用混凝土保养装置,包括基座,基座顶端的一侧设有水箱,水箱顶端的中心位置处设有注液口,注液口的底端延伸至水箱的内部,水箱一侧的基座底端设有通液框,通液框的底端安装有等间距的喷嘴,基座底端的一侧设有前轴杆,前轴杆的两端皆活动连接有前滚轮,基座底端的另一侧设有后轴杆,后轴杆的两端皆转动连接有后滚轮,水箱的上方设有太阳能光伏板。本发明不仅达到了液位监测的目的,进而降低了水箱内部水源因耗尽致使养护作业停止的现象,还达到了对保养装置进行太阳能供电的目的,进而提高了保养装置使用时的节能性,而且方便对该保养装置进行输送转运,以提升保养装置对混凝土地面养护时的便捷性。
Concrete maintenance device for building construction
The concrete maintenance device for building construction comprises a base, a water tank is arranged on one side of the top end of the base, a liquid injection opening is formed in the center of the top end of the water tank, the bottom end of the liquid injection opening extends into the water tank, a liquid passing frame is arranged at the position, on one side of the water tank, of the bottom end of the base, and nozzles are installed at the bottom end of the liquid passing frame at equal intervals. A front shaft rod is arranged on one side of the bottom end of the base, front rolling wheels are movably connected to the two ends of the front shaft rod, a rear shaft rod is arranged on the other side of the bottom end of the base, rear rolling wheels are rotationally connected to the two ends of the rear shaft rod, and a solar photovoltaic panel is arranged above the water tank. The purpose of liquid level monitoring is achieved, the phenomenon that maintenance operation is stopped due to exhaustion of a water source in the water tank is reduced, the purpose of solar power supply to the maintenance device is achieved, the energy saving performance of the maintenance device during use is improved, the maintenance device can be conveniently conveyed and transferred, and the maintenance efficiency is improved. The convenience of the maintenance device during concrete floor maintenance is improved.
本发明公开了一种建筑施工用混凝土保养装置,包括基座,基座顶端的一侧设有水箱,水箱顶端的中心位置处设有注液口,注液口的底端延伸至水箱的内部,水箱一侧的基座底端设有通液框,通液框的底端安装有等间距的喷嘴,基座底端的一侧设有前轴杆,前轴杆的两端皆活动连接有前滚轮,基座底端的另一侧设有后轴杆,后轴杆的两端皆转动连接有后滚轮,水箱的上方设有太阳能光伏板。本发明不仅达到了液位监测的目的,进而降低了水箱内部水源因耗尽致使养护作业停止的现象,还达到了对保养装置进行太阳能供电的目的,进而提高了保养装置使用时的节能性,而且方便对该保养装置进行输送转运,以提升保养装置对混凝土地面养护时的便捷性。
Concrete maintenance device for building construction
一种建筑施工用混凝土保养装置
DONG ZHIYANG (author) / LI MINGYUAN (author) / WANG SIZHEN (author) / MA WEIZHAO (author) / ZHAO JIANQIANG (author) / LIU XIAOZHENG (author) / SU YUHUI (author) / GAO SHIXIN (author) / CHEN RUI (author) / LI JIAYUE (author)
2023-12-19
Patent
Electronic Resource
Chinese
Building construction concrete coating maintenance device
European Patent Office | 2023
|