A platform for research: civil engineering, architecture and urbanism
Pier body construction method of disassembly-free bent frame without inner pull rod
The invention relates to a pier body construction method of an inner-pull-rod-free disassembly-free bent frame, which comprises the following steps of: 1, splicing bent frame parts to form bent frame single bodies, fixing the bent frame single bodies on the outer side walls of the bent frame single bodies by using fasteners, and mutually stacking and splicing a plurality of bent frame single bodies to form a whole frame; secondly, a foundation pit is dug in the preset position, anchor bars are driven into the bottom of the foundation pit, and concrete is poured to form a foundation; thirdly, the whole frame is hoisted and placed on a foundation, and then a reinforcement cage is placed in the whole frame; fourthly, concrete is poured into the whole frame till the whole frame is filled with the concrete; 5, the whole frame is hoisted, and then the whole frame is vertically placed on the ground through a fixing assembly; and 6, repeating the step 2 to the step 5 at the next construction site. The method has the effects of reducing the bent frame construction process and accelerating the pier construction progress.
本申请涉及一种无内拉杆免拆排架的墩身施工方法,其包括步骤一:将排架零部件拼接形成排架单体,在排架单体外侧壁使用紧固件将排架单体固定,将若干排架单体相互叠放拼接形成整架;步骤二:在预定位置挖出基坑,在基坑底部打入锚筋并浇筑混凝土形成地基;步骤三:将整架吊起放入地基上,再将钢筋笼放入整架内;步骤四:往整架内灌注混凝土直至整架内充满混凝土;步骤五:将整架吊起,再使用固定组件将整架竖直放置于地面;步骤六:在下一施工地点重复步骤二到步骤五。本申请具有减少排架施工流程,加快桥墩施工进度的效果。
Pier body construction method of disassembly-free bent frame without inner pull rod
The invention relates to a pier body construction method of an inner-pull-rod-free disassembly-free bent frame, which comprises the following steps of: 1, splicing bent frame parts to form bent frame single bodies, fixing the bent frame single bodies on the outer side walls of the bent frame single bodies by using fasteners, and mutually stacking and splicing a plurality of bent frame single bodies to form a whole frame; secondly, a foundation pit is dug in the preset position, anchor bars are driven into the bottom of the foundation pit, and concrete is poured to form a foundation; thirdly, the whole frame is hoisted and placed on a foundation, and then a reinforcement cage is placed in the whole frame; fourthly, concrete is poured into the whole frame till the whole frame is filled with the concrete; 5, the whole frame is hoisted, and then the whole frame is vertically placed on the ground through a fixing assembly; and 6, repeating the step 2 to the step 5 at the next construction site. The method has the effects of reducing the bent frame construction process and accelerating the pier construction progress.
本申请涉及一种无内拉杆免拆排架的墩身施工方法,其包括步骤一:将排架零部件拼接形成排架单体,在排架单体外侧壁使用紧固件将排架单体固定,将若干排架单体相互叠放拼接形成整架;步骤二:在预定位置挖出基坑,在基坑底部打入锚筋并浇筑混凝土形成地基;步骤三:将整架吊起放入地基上,再将钢筋笼放入整架内;步骤四:往整架内灌注混凝土直至整架内充满混凝土;步骤五:将整架吊起,再使用固定组件将整架竖直放置于地面;步骤六:在下一施工地点重复步骤二到步骤五。本申请具有减少排架施工流程,加快桥墩施工进度的效果。
Pier body construction method of disassembly-free bent frame without inner pull rod
一种无内拉杆免拆排架的墩身施工方法
JIANG MEIJUN (author) / WU GUANGMING (author) / LAN GUOYOU (author) / ZHANG YINGHONG (author) / GAO JIANBO (author) / KUANG CHANGSHENG (author) / MENG QING (author) / YU GUIBO (author) / YANG YONG (author) / LI SHAOHUA (author)
2023-12-22
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Construction method of pull-rod-free pier body template of dolphin pier
European Patent Office | 2015
|Bottle pier body and bent cap integrated construction formwork
European Patent Office | 2021
|Pier column reinforcement cage binding jig frame and bent cap construction method
European Patent Office | 2024
|