A platform for research: civil engineering, architecture and urbanism
Geological disaster emergency treatment system and geological disaster emergency protection method
The invention discloses a geological disaster emergency treatment system which comprises a blocking rod base and blocking rods with elastic recovery capacity on the blocking rod base, the blocking rods are connected through a large net bag, a series connection hole is formed in the upper end of each blocking rod, a rope penetrates through the series connection holes and binds the upper portion of the large net bag to form series connection, and the blocking rods are provided with telescopic supporting rods. The lower ends of the telescopic supporting rods are connected to the supporting rod base in a recoverable and swinging mode, the upper ends of the telescopic supporting rods are connected with the stopping rods in a swinging mode, each stopping rod is provided with at least two telescopic supporting rods, the telescopic supporting rods are supported between the stopping rods and a soil body on the lower side, and the net bag is obliquely arranged upwards. And a multi-layer elastic stopper is arranged on the slope above the large net bag. The device and the method provided by the invention can realize rapid protection layout, can be rapidly applied in emergency, and can be flexibly disassembled and used according to terrains and disaster types.
本发明公开了一种地质灾害紧急处理系统,包括阻拦杆基座,阻拦杆基座带有弹性回复能力的阻拦杆,各阻拦杆采用大网兜连接,阻拦杆上端带有串接孔,绳索穿过串接孔并绑定大网兜上部形成串接,阻拦杆配置有伸缩支撑杆,伸缩支撑杆下端可回复地摆动连接于支撑杆基座,伸缩支撑杆上端与阻拦杆摆动连接,每个阻拦杆至少配置两根伸缩支撑杆,伸缩支撑杆支撑在阻拦杆和下侧的土体之间,所述网兜倾斜向上设置,所述大网兜上方的斜坡上设置有多层次的弹性阻拦器。本发明提供的装置和方法能够实现快速防护布设,在紧急情况下能够快速应用,且能够根据地形和灾害类型灵活分拆使用。
Geological disaster emergency treatment system and geological disaster emergency protection method
The invention discloses a geological disaster emergency treatment system which comprises a blocking rod base and blocking rods with elastic recovery capacity on the blocking rod base, the blocking rods are connected through a large net bag, a series connection hole is formed in the upper end of each blocking rod, a rope penetrates through the series connection holes and binds the upper portion of the large net bag to form series connection, and the blocking rods are provided with telescopic supporting rods. The lower ends of the telescopic supporting rods are connected to the supporting rod base in a recoverable and swinging mode, the upper ends of the telescopic supporting rods are connected with the stopping rods in a swinging mode, each stopping rod is provided with at least two telescopic supporting rods, the telescopic supporting rods are supported between the stopping rods and a soil body on the lower side, and the net bag is obliquely arranged upwards. And a multi-layer elastic stopper is arranged on the slope above the large net bag. The device and the method provided by the invention can realize rapid protection layout, can be rapidly applied in emergency, and can be flexibly disassembled and used according to terrains and disaster types.
本发明公开了一种地质灾害紧急处理系统,包括阻拦杆基座,阻拦杆基座带有弹性回复能力的阻拦杆,各阻拦杆采用大网兜连接,阻拦杆上端带有串接孔,绳索穿过串接孔并绑定大网兜上部形成串接,阻拦杆配置有伸缩支撑杆,伸缩支撑杆下端可回复地摆动连接于支撑杆基座,伸缩支撑杆上端与阻拦杆摆动连接,每个阻拦杆至少配置两根伸缩支撑杆,伸缩支撑杆支撑在阻拦杆和下侧的土体之间,所述网兜倾斜向上设置,所述大网兜上方的斜坡上设置有多层次的弹性阻拦器。本发明提供的装置和方法能够实现快速防护布设,在紧急情况下能够快速应用,且能够根据地形和灾害类型灵活分拆使用。
Geological disaster emergency treatment system and geological disaster emergency protection method
地质灾害紧急处理系统及地质灾害紧急防护方法
SHI JUNLONG (author) / LIU DONG (author) / WU YI (author) / QIN HAIYAN (author) / ZHANG YUZHI (author)
2023-12-22
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Hillside debris flow geological disaster protection system
European Patent Office | 2023
|