Reverse construction method latticed column construction method
The invention relates to a reverse construction method latticed column construction method which comprises the following steps: step 1, before a pile hole is formed, a site is leveled, and an adjusting assembly is mounted; 2, pile holes are drilled through pile driving equipment; 3, the positioning column is placed into the pile hole through hoisting equipment till the lower end of the positioning column abuts against the bottom of the pile hole; 4, the positioning pile is adjusted through an adjusting assembly, so that the positioning pile is kept in a vertical state, then concrete mortar is poured to the bottom of the pile hole, the positioning pile can be fixed, and then the adjusting assembly is dismantled; and 5, the positioning columns are sequentially sleeved with the positioning sleeves on the latticed columns, the latticed columns are placed in the pile holes, the latticed columns can be positioned through the positioning sleeves, and therefore the perpendicularity of the latticed columns is guaranteed. The method has the effect of ensuring the perpendicularity of the latticed column.
本申请涉及逆作法格构柱施工方法,包括如下步骤:步骤1:在桩孔成型之前,对场地进行整平并安装调节组件;步骤2:打桩设备打出桩孔;步骤3:通过吊装设备将定位柱放入桩孔内,直至定位柱的下端抵接于桩孔的底部;步骤4:通过调节组件对定位桩进行调节,使得定位桩保持垂直状态,然后往桩孔的底部浇筑混凝土砂浆,可对定位桩进行固定,接着拆除调节组件;步骤5:将格构柱上的定位套依次套设于定位柱上,并将格构柱放入桩孔内,通过定位套可对格构柱进行定位,从而保证格构柱的垂直度。本申请具有保证格构柱的垂直度的效果。
Reverse construction method latticed column construction method
The invention relates to a reverse construction method latticed column construction method which comprises the following steps: step 1, before a pile hole is formed, a site is leveled, and an adjusting assembly is mounted; 2, pile holes are drilled through pile driving equipment; 3, the positioning column is placed into the pile hole through hoisting equipment till the lower end of the positioning column abuts against the bottom of the pile hole; 4, the positioning pile is adjusted through an adjusting assembly, so that the positioning pile is kept in a vertical state, then concrete mortar is poured to the bottom of the pile hole, the positioning pile can be fixed, and then the adjusting assembly is dismantled; and 5, the positioning columns are sequentially sleeved with the positioning sleeves on the latticed columns, the latticed columns are placed in the pile holes, the latticed columns can be positioned through the positioning sleeves, and therefore the perpendicularity of the latticed columns is guaranteed. The method has the effect of ensuring the perpendicularity of the latticed column.
本申请涉及逆作法格构柱施工方法,包括如下步骤:步骤1:在桩孔成型之前,对场地进行整平并安装调节组件;步骤2:打桩设备打出桩孔;步骤3:通过吊装设备将定位柱放入桩孔内,直至定位柱的下端抵接于桩孔的底部;步骤4:通过调节组件对定位桩进行调节,使得定位桩保持垂直状态,然后往桩孔的底部浇筑混凝土砂浆,可对定位桩进行固定,接着拆除调节组件;步骤5:将格构柱上的定位套依次套设于定位柱上,并将格构柱放入桩孔内,通过定位套可对格构柱进行定位,从而保证格构柱的垂直度。本申请具有保证格构柱的垂直度的效果。
Reverse construction method latticed column construction method
逆作法格构柱施工方法
WANG YAO (author) / XU HONGGUANG (author) / ZHANG HENGCHUN (author) / JIANG NA (author) / HUANG XIA (author) / HUANG JUANJUAN (author) / HUANG YANGSHU (author)
2023-12-22
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2021
|Construction method of latticed column supporting platform system for latticed shell installation
European Patent Office | 2021
|Construction method for hoisting latticed column in place
European Patent Office | 2024
|