A platform for research: civil engineering, architecture and urbanism
Fabricated cantilever component for external scaffold construction
The invention relates to an assembly type overhanging component for external scaffold construction, and belongs to the technical field of external scaffold construction, the assembly type overhanging component comprises two groups of overhanging units arranged in parallel and a bearing assembly located between the two groups of overhanging units, each overhanging unit comprises an overhanging beam and an end panel which are fixedly connected, and the bearing assembly comprises a bearing disc and a first connecting rod; the bearing disc is located above the cantilever beams and perpendicularly fixed to the first connecting rod, the first connecting rod is located between the two cantilever beams and can move in the length direction of the cantilever beams, the axis of the first connecting rod is perpendicular to the length direction of the cantilever beams, and the end, away from the bearing disc, of the first connecting rod is connected with a first fastener in a threaded fit mode. The first fastener is used for clamping the cantilever beam with the bearing disc. The method has the effect of improving the construction safety.
本申请涉及一种外脚手架施工用装配式悬挑构件,属于外脚手架施工技术领域,包括两组并列设置的悬挑单元以及位于两组悬挑单元之间的承托组件,悬挑单元包括固定连接的悬挑梁以及端面板,承托组件包括承托盘以及第一连接杆,承托盘位于悬挑梁上方并与第一连接杆垂直固定,第一连接杆位于两根悬挑梁之间并可沿悬挑梁长度方向移动,第一连接杆的轴线与悬挑梁的长度方向垂直,第一连接杆远离承托盘的一端通过螺纹配合的方式连接有第一紧固件,第一紧固件用于与承托盘对悬挑梁进行夹持。本申请具有提高施工安全性的效果。
Fabricated cantilever component for external scaffold construction
The invention relates to an assembly type overhanging component for external scaffold construction, and belongs to the technical field of external scaffold construction, the assembly type overhanging component comprises two groups of overhanging units arranged in parallel and a bearing assembly located between the two groups of overhanging units, each overhanging unit comprises an overhanging beam and an end panel which are fixedly connected, and the bearing assembly comprises a bearing disc and a first connecting rod; the bearing disc is located above the cantilever beams and perpendicularly fixed to the first connecting rod, the first connecting rod is located between the two cantilever beams and can move in the length direction of the cantilever beams, the axis of the first connecting rod is perpendicular to the length direction of the cantilever beams, and the end, away from the bearing disc, of the first connecting rod is connected with a first fastener in a threaded fit mode. The first fastener is used for clamping the cantilever beam with the bearing disc. The method has the effect of improving the construction safety.
本申请涉及一种外脚手架施工用装配式悬挑构件,属于外脚手架施工技术领域,包括两组并列设置的悬挑单元以及位于两组悬挑单元之间的承托组件,悬挑单元包括固定连接的悬挑梁以及端面板,承托组件包括承托盘以及第一连接杆,承托盘位于悬挑梁上方并与第一连接杆垂直固定,第一连接杆位于两根悬挑梁之间并可沿悬挑梁长度方向移动,第一连接杆的轴线与悬挑梁的长度方向垂直,第一连接杆远离承托盘的一端通过螺纹配合的方式连接有第一紧固件,第一紧固件用于与承托盘对悬挑梁进行夹持。本申请具有提高施工安全性的效果。
Fabricated cantilever component for external scaffold construction
一种外脚手架施工用装配式悬挑构件
KANG YI (author) / XU YIMING (author) / CHENG JIAN (author) / JIN QING (author) / LI GUILAI (author) / FU QINGYUN (author) / FAN BINHUA (author)
2023-12-22
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Construction method of fabricated external flower basket type cantilever scaffold
European Patent Office | 2023
|Construction method of cantilever scaffold for construction of fabricated structure
European Patent Office | 2023
|European Patent Office | 2021
|Fabricated building cantilever component and construction method
European Patent Office | 2024
|