A platform for research: civil engineering, architecture and urbanism
The invention provides an assembled municipal construction coaming. The split mounting type municipal construction coaming comprises a first base, a second base and a connecting piece, the supporting rod is fixedly connected to the top of the first base, a cross rod is arranged on one side of the supporting rod through a mounting buckle, another supporting rod is arranged on one side of the cross rod through a mounting buckle, a second base is arranged on one side of the first base, and a third base is arranged on the other side of the second base. According to the split mounting type municipal construction coaming provided by the invention, the first base, the second base, the third base and the fourth base can be combined together by disassembling the cross rods on the first base and the fourth base, a construction exterior surrounding a well lid can be formed after the equipment is unfolded, and meanwhile, a warning effect can be achieved at night through a warning lamp; and when not in use, the first base, the second base, the third base and the fourth base can be folded to be combined together so as to facilitate transportation.
本发明提供一种拼装式市政施工围板。所述拼装式市政施工围板包括:第一底座;支撑杆,所述支撑杆固定连接在第一底座的顶部,所述支撑杆的一侧通过安装扣设置有交叉杆,所述交叉杆的一侧同样通过安装扣设置有另一个支撑杆,所述第一底座的一侧设置有第二底座,所述第二底座的另一侧设置有第三底座。本发明提供的拼装式市政施工围板,再将第一底座和第四底座上的交叉杆拆开,即可将第一底座、第二底座、第三底座和第四底座组合在一起,通过该设备在展开后可以形成一个包围井盖施工外部,同时可以通过警示灯在夜间起到警示作用,而在不使用时可以收起让第一底座、第二底座、第三底座和第四底座组合在一起方便运输。
The invention provides an assembled municipal construction coaming. The split mounting type municipal construction coaming comprises a first base, a second base and a connecting piece, the supporting rod is fixedly connected to the top of the first base, a cross rod is arranged on one side of the supporting rod through a mounting buckle, another supporting rod is arranged on one side of the cross rod through a mounting buckle, a second base is arranged on one side of the first base, and a third base is arranged on the other side of the second base. According to the split mounting type municipal construction coaming provided by the invention, the first base, the second base, the third base and the fourth base can be combined together by disassembling the cross rods on the first base and the fourth base, a construction exterior surrounding a well lid can be formed after the equipment is unfolded, and meanwhile, a warning effect can be achieved at night through a warning lamp; and when not in use, the first base, the second base, the third base and the fourth base can be folded to be combined together so as to facilitate transportation.
本发明提供一种拼装式市政施工围板。所述拼装式市政施工围板包括:第一底座;支撑杆,所述支撑杆固定连接在第一底座的顶部,所述支撑杆的一侧通过安装扣设置有交叉杆,所述交叉杆的一侧同样通过安装扣设置有另一个支撑杆,所述第一底座的一侧设置有第二底座,所述第二底座的另一侧设置有第三底座。本发明提供的拼装式市政施工围板,再将第一底座和第四底座上的交叉杆拆开,即可将第一底座、第二底座、第三底座和第四底座组合在一起,通过该设备在展开后可以形成一个包围井盖施工外部,同时可以通过警示灯在夜间起到警示作用,而在不使用时可以收起让第一底座、第二底座、第三底座和第四底座组合在一起方便运输。
Assembled municipal construction coaming
一种拼装式市政施工围板
CHEN XUANCHI (author)
2023-12-22
Patent
Electronic Resource
Chinese
IPC:
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
/
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
Building demolition enclosed coaming facility construction method
European Patent Office | 2015
|Novel high-speed rail bridge pier top coaming construction method
European Patent Office | 2024
|