A platform for research: civil engineering, architecture and urbanism
Bridge transverse moving mechanism and bridge construction equipment
The invention relates to a bridge transverse moving mechanism and bridge construction equipment. The bridge transverse moving mechanism comprises a sliding way assembly, a first sliding piece and a second sliding piece, the first sliding piece is arranged on a sliding rail of the sliding way assembly, the second sliding piece is arranged at the sliding starting end of the first sliding piece and located on the side, back to the sliding terminal, of the limiting inclined face, and the gravity of the bridge deck truss is applied to the sliding starting end through the second sliding piece. When the temporary support working platform is connected with the bridge pier, the sliding terminal of the first sliding piece slightly tilts, the sliding terminal can easily cross the connecting position of the temporary support working platform and the bridge pier, and then the sliding starting end and the second sliding piece easily cross the connecting position of the temporary support working platform and the bridge pier. After the first sliding piece slides in place, the second sliding piece overcomes the friction force of the limiting inclined face and continues to slide on the first sliding piece, and the moving stroke of the bridge deck truss is increased. And the first sliding piece is matched with the second sliding piece, so that the second sliding piece moves more smoothly, and the construction efficiency is guaranteed.
本申请涉及一种桥梁横移机构及桥梁施工设备。桥梁横移机构包括滑道组件、第一滑动件及第二滑动件,第一滑动件设置于滑道组件的滑轨上,第二滑动件设置在第一滑动件的滑动始端上且位于限位斜面背向于滑动终端的一侧,桥面桁架的重力通过第二滑动件施加在滑动始端,会使得第一滑动件的滑动终端发生轻微翘起,使滑动终端能轻松跨过临时支架工作平台与桥墩的连接处,进而使滑动始端及第二滑动件轻松跨过临时支架工作平台与桥墩的连接处。第一滑动件滑动到位后,第二滑动件克服限位斜面的摩擦力在第一滑动件上继续滑动,增加桥面桁架的移动行程。利用第一滑动件与第二滑动件的配合,使第二滑动件的移动更加顺畅,保证施工效率。
Bridge transverse moving mechanism and bridge construction equipment
The invention relates to a bridge transverse moving mechanism and bridge construction equipment. The bridge transverse moving mechanism comprises a sliding way assembly, a first sliding piece and a second sliding piece, the first sliding piece is arranged on a sliding rail of the sliding way assembly, the second sliding piece is arranged at the sliding starting end of the first sliding piece and located on the side, back to the sliding terminal, of the limiting inclined face, and the gravity of the bridge deck truss is applied to the sliding starting end through the second sliding piece. When the temporary support working platform is connected with the bridge pier, the sliding terminal of the first sliding piece slightly tilts, the sliding terminal can easily cross the connecting position of the temporary support working platform and the bridge pier, and then the sliding starting end and the second sliding piece easily cross the connecting position of the temporary support working platform and the bridge pier. After the first sliding piece slides in place, the second sliding piece overcomes the friction force of the limiting inclined face and continues to slide on the first sliding piece, and the moving stroke of the bridge deck truss is increased. And the first sliding piece is matched with the second sliding piece, so that the second sliding piece moves more smoothly, and the construction efficiency is guaranteed.
本申请涉及一种桥梁横移机构及桥梁施工设备。桥梁横移机构包括滑道组件、第一滑动件及第二滑动件,第一滑动件设置于滑道组件的滑轨上,第二滑动件设置在第一滑动件的滑动始端上且位于限位斜面背向于滑动终端的一侧,桥面桁架的重力通过第二滑动件施加在滑动始端,会使得第一滑动件的滑动终端发生轻微翘起,使滑动终端能轻松跨过临时支架工作平台与桥墩的连接处,进而使滑动始端及第二滑动件轻松跨过临时支架工作平台与桥墩的连接处。第一滑动件滑动到位后,第二滑动件克服限位斜面的摩擦力在第一滑动件上继续滑动,增加桥面桁架的移动行程。利用第一滑动件与第二滑动件的配合,使第二滑动件的移动更加顺畅,保证施工效率。
Bridge transverse moving mechanism and bridge construction equipment
桥梁横移机构及桥梁施工设备
JIN HE (author) / WU YUXIAN (author) / GUO BIAO (author) / CAI YANBIAO (author) / JIA XI (author) / ZHANG CHUNMU (author) / LI KUNXING (author) / WANG LE (author) / HU BOZHI (author) / XIAO YUE (author)
2023-12-26
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Bridge transverse moving mechanism for bridge construction
European Patent Office | 2024
|Bridge fabrication machine transverse-moving pushing construction method
European Patent Office | 2021
|Bridge moving hanging basket device for bridge construction
European Patent Office | 2023
|European Patent Office | 2023
|