A platform for research: civil engineering, architecture and urbanism
Fabricated seismic isolation foundation and steel structure house with same
The invention discloses an assembly type seismic isolation foundation and a steel structure house with the same. The assembly type seismic isolation foundation comprises a prefabricated foundation, a seismic isolation device and a steel column. Foundation bolts are embedded in the prefabricated foundation, and the threaded ends of the foundation bolts are exposed out of the top face of the prefabricated foundation. The vibration isolator is arranged on the top surface of the prefabricated foundation, and the bottom surface of the vibration isolator is in threaded connection with the foundation bolt; a connecting plate is fixed to the bottom end of the steel column, and the connecting plate and the top face of the vibration isolator are fastened through high-strength bolts. During construction, the prefabricated foundation, the steel columns and the steel beams are manufactured in a factory firstly, then the vibration isolation devices, the steel columns, the steel beams, the wall panels and the roof panels are connected in sequence, and the steel structure housing with the columns and the beams made of heavy steel and the enclosure walls made of light steel is completed. The steel structure house can be prefabricated in a factory according to design drawings, assembly type construction can be achieved, the construction period is shortened, construction pollution is reduced, meanwhile, manufacturing is convenient, the operation efficiency can be improved, the construction period is shortened, meanwhile, the shock isolation devices can isolate shock under eight-level earthquakes, the anti-seismic performance of the house is improved, and the steel structure house is worthy of being vigorously popularized.
本发明公开了一种装配式免震基础及具有其的钢结构住房,包括预制基础、免震器及钢柱;预制基础内预埋有地脚螺栓,地脚螺栓的螺纹端外露在预制基础的顶面;免震器设在预制基础的顶面,且其底面与地脚螺栓螺纹连接;钢柱的底端固定有连接板,连接板与免震器的顶面通过高强螺栓紧固。施工时,先在工厂制作预制基础、钢柱及钢梁,之后依次连接免震器、钢柱、钢梁,连接墙面板和屋面板,完成以柱梁为重钢,围护墙为轻钢的钢结构住房。本发明的钢结构住房可根据设计图纸在工厂预制,能够实现装配式施工,减少工期和施工污染,同时制作方便,能够提高作业效率,减少工期,同时免震器能够在八级地震下免震,提高住房的抗震性能,值得大力推广。
Fabricated seismic isolation foundation and steel structure house with same
The invention discloses an assembly type seismic isolation foundation and a steel structure house with the same. The assembly type seismic isolation foundation comprises a prefabricated foundation, a seismic isolation device and a steel column. Foundation bolts are embedded in the prefabricated foundation, and the threaded ends of the foundation bolts are exposed out of the top face of the prefabricated foundation. The vibration isolator is arranged on the top surface of the prefabricated foundation, and the bottom surface of the vibration isolator is in threaded connection with the foundation bolt; a connecting plate is fixed to the bottom end of the steel column, and the connecting plate and the top face of the vibration isolator are fastened through high-strength bolts. During construction, the prefabricated foundation, the steel columns and the steel beams are manufactured in a factory firstly, then the vibration isolation devices, the steel columns, the steel beams, the wall panels and the roof panels are connected in sequence, and the steel structure housing with the columns and the beams made of heavy steel and the enclosure walls made of light steel is completed. The steel structure house can be prefabricated in a factory according to design drawings, assembly type construction can be achieved, the construction period is shortened, construction pollution is reduced, meanwhile, manufacturing is convenient, the operation efficiency can be improved, the construction period is shortened, meanwhile, the shock isolation devices can isolate shock under eight-level earthquakes, the anti-seismic performance of the house is improved, and the steel structure house is worthy of being vigorously popularized.
本发明公开了一种装配式免震基础及具有其的钢结构住房,包括预制基础、免震器及钢柱;预制基础内预埋有地脚螺栓,地脚螺栓的螺纹端外露在预制基础的顶面;免震器设在预制基础的顶面,且其底面与地脚螺栓螺纹连接;钢柱的底端固定有连接板,连接板与免震器的顶面通过高强螺栓紧固。施工时,先在工厂制作预制基础、钢柱及钢梁,之后依次连接免震器、钢柱、钢梁,连接墙面板和屋面板,完成以柱梁为重钢,围护墙为轻钢的钢结构住房。本发明的钢结构住房可根据设计图纸在工厂预制,能够实现装配式施工,减少工期和施工污染,同时制作方便,能够提高作业效率,减少工期,同时免震器能够在八级地震下免震,提高住房的抗震性能,值得大力推广。
Fabricated seismic isolation foundation and steel structure house with same
一种装配式免震基础及具有其的钢结构住房
ZHU LIANJI (author)
2023-12-26
Patent
Electronic Resource
Chinese
European Patent Office | 2020
|Anti-seismic foundation structure of fabricated building
European Patent Office | 2021
|Elastic anti-seismic structure based on fabricated steel structure house
European Patent Office | 2023
|Fabricated concrete structure interlayer seismic isolation structure
European Patent Office | 2021
|