A platform for research: civil engineering, architecture and urbanism
Conversion layer suspended ceiling structure and construction method thereof
The invention relates to a transfer floor suspended ceiling structure which is arranged in a building structure and comprises a plurality of transverse keels connected with two opposite wall bodies of the building structure, and fixing grooves are formed in the side walls of the transverse keels; the longitudinal keels are arranged between every two adjacent transverse keels at intervals, and connecting grooves are formed in the side walls of the longitudinal keels; the connecting clamping piece is connected with the fixing groove and the connecting groove; the two side keels are fixed to the two opposite wall bodies of the building structure and located below the transverse keels, and arrangement grooves are formed in the sides, away from the wall bodies, of the side keels; the auxiliary keels are connected between the two arrangement grooves, and connecting rods are fixedly connected between the auxiliary keels and the longitudinal keels.
本发明涉及一种转换层吊顶结构,设置于建筑结构内,所述转换层结构包括:连接所述建筑结构相对的两个墙体的若干个横向龙骨,所述横向龙骨的侧壁形成有固定槽;间隔设置于两个相邻的所述横向龙骨之间的纵向龙骨,所述纵向龙骨的侧壁形成有连接槽;连接所述固定槽和所述连接槽的连接卡件;固定于所述建筑结构相对的两个墙体且位于所述横向龙骨的下方的两个边龙骨,所述边龙骨远离墙体的一侧形成有设置槽;以及连接两个设置槽之间的若干个副龙骨,所述副龙骨和所述纵向龙骨之间固定连接有连接杆。
Conversion layer suspended ceiling structure and construction method thereof
The invention relates to a transfer floor suspended ceiling structure which is arranged in a building structure and comprises a plurality of transverse keels connected with two opposite wall bodies of the building structure, and fixing grooves are formed in the side walls of the transverse keels; the longitudinal keels are arranged between every two adjacent transverse keels at intervals, and connecting grooves are formed in the side walls of the longitudinal keels; the connecting clamping piece is connected with the fixing groove and the connecting groove; the two side keels are fixed to the two opposite wall bodies of the building structure and located below the transverse keels, and arrangement grooves are formed in the sides, away from the wall bodies, of the side keels; the auxiliary keels are connected between the two arrangement grooves, and connecting rods are fixedly connected between the auxiliary keels and the longitudinal keels.
本发明涉及一种转换层吊顶结构,设置于建筑结构内,所述转换层结构包括:连接所述建筑结构相对的两个墙体的若干个横向龙骨,所述横向龙骨的侧壁形成有固定槽;间隔设置于两个相邻的所述横向龙骨之间的纵向龙骨,所述纵向龙骨的侧壁形成有连接槽;连接所述固定槽和所述连接槽的连接卡件;固定于所述建筑结构相对的两个墙体且位于所述横向龙骨的下方的两个边龙骨,所述边龙骨远离墙体的一侧形成有设置槽;以及连接两个设置槽之间的若干个副龙骨,所述副龙骨和所述纵向龙骨之间固定连接有连接杆。
Conversion layer suspended ceiling structure and construction method thereof
一种转换层吊顶结构及其施工方法
WANG XIAOLONG (author) / SONG ZEXIN (author) / XU ZHIQIANG (author) / HU WENGANG (author) / GOU ERZHOU (author) / ZHANG SHENGZHE (author) / REN LULU (author) / GUO XUANQIN (author) / WANG RONG (author) / HU KAI (author)
2023-12-26
Patent
Electronic Resource
Chinese
Conversion layer suspended ceiling structure and construction method thereof
European Patent Office | 2024
|European Patent Office | 2024
|Construction method for suspended ceiling conversion layer
European Patent Office | 2024
|SUSPENDED CEILING STRUCTURE AND SUSPENDED CEILING CONSTRUCTION METHOD
European Patent Office | 2015
|Construction method of grid structure roof suspended ceiling conversion layer structure
European Patent Office | 2023
|