A platform for research: civil engineering, architecture and urbanism
Deformation joint structure combining prevention and drainage and construction method thereof
The invention discloses a prevention and drainage combined deformation joint structure and a construction method thereof. The prevention and drainage combined deformation joint structure comprises a left upper turning plate, a right upper turning plate, an upper sealing structure and a lower sealing structure, the left upper turning plate is longitudinally arranged on the floor on the left side of the deformation joint in a full-length manner; a slot is formed in one side, facing the deformation joint, of the bottom of the left upper turning plate in the longitudinal direction in a full-length manner; the right upper turning plate is longitudinally arranged on the floor on the right side of the deformation joint in a full-length manner; the upper end of the right upper turning plate exceeds the upper end of the left upper turning plate, and a folded plate is arranged on the left side surface of the exceeding part; the folding plate is positioned above the deformation joint and the left upper turning plate; the upper sealing structure comprises an upper plugging plate and an upper sealing strip; the lower sealing structure comprises a lower sealing strip and a cover plate; the lower sealing strip is arranged at the lower part of the deformation joint along the longitudinal full length; the cover plate covers the bottom of the deformation joint; a flow guide groove is formed in the position, corresponding to the inserting groove, in the deformation joint. The technical problems that in a traditional deformation joint structure, material aging or damage easily causes roof leakage and water damage, the structural attractiveness is affected, deformation is limited, and the enclosure cost is high are solved.
一种防排结合的变形缝结构及其施工方法,包括左上翻板、右上翻板、上封口结构和下封口结构;左上翻板沿纵向通长设置在变形缝左侧的楼板上;在左上翻板的底部、面向变形缝一侧沿纵向通长设置有插槽;右上翻板沿纵向通长设置在变形缝右侧的楼板上;右上翻板的上端超出左上翻板的上端,且超出部位的左侧面设置有折板;折板位于变形缝和左上翻板的上方;上封口结构包括上封堵板和上密封条;下封口结构包括下密封条和盖板;下密封条沿纵向通长设在变形缝下部;盖板盖在变形缝底部;变形缝内、对应插槽的位置处设置有导流槽。本发明解决了传统的变形缝结构中材料老化或损坏容易导致屋面渗漏和水损、影响结构美观性、变形受到限制以及围护成本较高的技术问题。
Deformation joint structure combining prevention and drainage and construction method thereof
The invention discloses a prevention and drainage combined deformation joint structure and a construction method thereof. The prevention and drainage combined deformation joint structure comprises a left upper turning plate, a right upper turning plate, an upper sealing structure and a lower sealing structure, the left upper turning plate is longitudinally arranged on the floor on the left side of the deformation joint in a full-length manner; a slot is formed in one side, facing the deformation joint, of the bottom of the left upper turning plate in the longitudinal direction in a full-length manner; the right upper turning plate is longitudinally arranged on the floor on the right side of the deformation joint in a full-length manner; the upper end of the right upper turning plate exceeds the upper end of the left upper turning plate, and a folded plate is arranged on the left side surface of the exceeding part; the folding plate is positioned above the deformation joint and the left upper turning plate; the upper sealing structure comprises an upper plugging plate and an upper sealing strip; the lower sealing structure comprises a lower sealing strip and a cover plate; the lower sealing strip is arranged at the lower part of the deformation joint along the longitudinal full length; the cover plate covers the bottom of the deformation joint; a flow guide groove is formed in the position, corresponding to the inserting groove, in the deformation joint. The technical problems that in a traditional deformation joint structure, material aging or damage easily causes roof leakage and water damage, the structural attractiveness is affected, deformation is limited, and the enclosure cost is high are solved.
一种防排结合的变形缝结构及其施工方法,包括左上翻板、右上翻板、上封口结构和下封口结构;左上翻板沿纵向通长设置在变形缝左侧的楼板上;在左上翻板的底部、面向变形缝一侧沿纵向通长设置有插槽;右上翻板沿纵向通长设置在变形缝右侧的楼板上;右上翻板的上端超出左上翻板的上端,且超出部位的左侧面设置有折板;折板位于变形缝和左上翻板的上方;上封口结构包括上封堵板和上密封条;下封口结构包括下密封条和盖板;下密封条沿纵向通长设在变形缝下部;盖板盖在变形缝底部;变形缝内、对应插槽的位置处设置有导流槽。本发明解决了传统的变形缝结构中材料老化或损坏容易导致屋面渗漏和水损、影响结构美观性、变形受到限制以及围护成本较高的技术问题。
Deformation joint structure combining prevention and drainage and construction method thereof
一种防排结合的变形缝结构及其施工方法
PENG FEI (author) / ZHOU LONGJIE (author) / WU ZAILONG (author) / LI JUN (author)
2023-12-29
Patent
Electronic Resource
Chinese
European Patent Office | 2022
|Drainage ditch and deformation joint combined structure and construction method thereof
European Patent Office | 2020
|Underground tunnel deformation joint leakage water drainage structure and construction method
European Patent Office | 2023
|Basement expansion joint drainage structure and construction method thereof
European Patent Office | 2023
|Deformation joint structure and construction method thereof
European Patent Office | 2023
|