A platform for research: civil engineering, architecture and urbanism
Erecting method of ring lock type scaffold
The invention relates to the technical field of building construction, in particular to a plate buckle type scaffold erecting method which comprises the following steps: S1, erecting a first section of construction frame body, erecting a frame body of a plate buckle type steel pipe scaffold to a foundation, and placing double-spliced section steel at a top support at the uppermost end as a shelving beam to form a platform; and S2, a second section of construction frame body is erected, an auxiliary vertical rod is placed on the double-spliced profile steel, the length of the auxiliary vertical rod is set and adjusted according to the upper space, and the adjusted auxiliary vertical rod is arranged to the bottom of a floor or the bottom of a structure secondary beam. The same-layer two-section type erecting construction method is adopted, so that the arrangement of the ring-lock type steel pipe scaffold body is not affected by the structural beams; according to the scaffold erecting method, the process is standardized, the scaffold erecting method has universality and is suitable for various construction scenes, the bearing strength is guaranteed, dismounting and mounting are convenient, scaffold pipe fittings are reduced to be lost, the scaffold pipe fittings can be reused after being dismounted, and the construction efficiency of building engineering is improved.
本申请涉及建筑施工技术领域,尤其是涉及一种盘扣式脚手架搭设方法,包括以下步骤:步骤S1,搭设第一段施工架体,将盘扣式钢管脚手架的架体搭设至基础地基处,最上端项托处放置双拼型钢作为搁置梁形成平台;步骤S2,搭设第二段施工架体,在所述双拼型钢上放置辅助立杆,辅助立杆的长度根据上部空间进行设置与调节,调节后辅助立杆设置至楼板底或结构次梁底。本申请采用同层两段式搭设施工方法,使盘扣式钢管脚手架架体的布置不受结构梁影响;盘扣式脚手架搭设方法流程规范化,本申请的脚手架搭设方法具有通用性,适用于多种施工场景下,承载强度得到保证,拆装便利,脚手架管件减少遗落丢失,拆除后可再次利用,加快了建筑工程施工效率。
Erecting method of ring lock type scaffold
The invention relates to the technical field of building construction, in particular to a plate buckle type scaffold erecting method which comprises the following steps: S1, erecting a first section of construction frame body, erecting a frame body of a plate buckle type steel pipe scaffold to a foundation, and placing double-spliced section steel at a top support at the uppermost end as a shelving beam to form a platform; and S2, a second section of construction frame body is erected, an auxiliary vertical rod is placed on the double-spliced profile steel, the length of the auxiliary vertical rod is set and adjusted according to the upper space, and the adjusted auxiliary vertical rod is arranged to the bottom of a floor or the bottom of a structure secondary beam. The same-layer two-section type erecting construction method is adopted, so that the arrangement of the ring-lock type steel pipe scaffold body is not affected by the structural beams; according to the scaffold erecting method, the process is standardized, the scaffold erecting method has universality and is suitable for various construction scenes, the bearing strength is guaranteed, dismounting and mounting are convenient, scaffold pipe fittings are reduced to be lost, the scaffold pipe fittings can be reused after being dismounted, and the construction efficiency of building engineering is improved.
本申请涉及建筑施工技术领域,尤其是涉及一种盘扣式脚手架搭设方法,包括以下步骤:步骤S1,搭设第一段施工架体,将盘扣式钢管脚手架的架体搭设至基础地基处,最上端项托处放置双拼型钢作为搁置梁形成平台;步骤S2,搭设第二段施工架体,在所述双拼型钢上放置辅助立杆,辅助立杆的长度根据上部空间进行设置与调节,调节后辅助立杆设置至楼板底或结构次梁底。本申请采用同层两段式搭设施工方法,使盘扣式钢管脚手架架体的布置不受结构梁影响;盘扣式脚手架搭设方法流程规范化,本申请的脚手架搭设方法具有通用性,适用于多种施工场景下,承载强度得到保证,拆装便利,脚手架管件减少遗落丢失,拆除后可再次利用,加快了建筑工程施工效率。
Erecting method of ring lock type scaffold
一种盘扣式脚手架搭设方法
MA HAIYAN (author) / YANG FAN (author) / CHEN JIE (author) / ZHANG DENGBIAO (author) / ZHANG GUIMING (author)
2023-12-29
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Method for erecting ring buckle type scaffold during curtain wall construction
European Patent Office | 2022
|