A platform for research: civil engineering, architecture and urbanism
The invention discloses a building construction facade brick arranging device which comprises a mechanical arm and a sliding base assembly installed at the bottom of the mechanical arm, a brick clamping assembly is arranged below the free end of the mechanical arm, and a connecting shaft is fixedly installed on the rear side of the top of the brick clamping assembly. The outer surface of the connecting shaft is rotationally sleeved with a positioning sleeve fixedly connected with the bottom of the free end of the mechanical arm, two protection assemblies arranged in a front-back mirror image mode are installed on the brick clamping assembly, and an overturning assembly used for adjusting the direction of the brick clamping assembly is installed between the mechanical arm and the brick clamping assembly. The brick clamping assembly comprises two side clamping plates which are used for clamping bricks and arranged front and back, and grooves are formed in the bottoms of the two side clamping plates. According to the brick clamping device, when the clamping assembly clamps the brick to ascend, the protection assembly is matched to adjust the protection supporting plate to the position below the brick so as to provide protection for the brick, the situation that the brick straightly falls down when the brick clamping assembly does not clamp the brick is avoided, and then the safety is improved while the loss is effectively reduced.
本发明公开了一种建筑施工立面排砖装置,包括机械臂,以及安装在机械臂底部的滑座组件,所述机械臂自由端的下方设置有夹砖组件,在夹砖组件顶部的后侧固定安装有衔接轴,所述衔接轴的外表面转动套设有与机械臂自由端底部固定连接的定位套筒,所述夹砖组件上安装有两个呈前后镜像布置的防护组件,在机械臂上和夹砖组件之间安装有用于调整夹砖组件方向的翻转组件,所述夹砖组件包括两个用于夹取砖块且呈前后布置的侧夹板,在两个侧夹板的底部均开设有凹槽。本发明中,在夹持组件夹住砖块上升之际,配合防护组件将防护托板调整至砖块的下方为其提供防护,谨防在夹砖组件未夹紧砖块之际,砖块径直往下掉落,继而有效减少损失的同时提高安全性。
The invention discloses a building construction facade brick arranging device which comprises a mechanical arm and a sliding base assembly installed at the bottom of the mechanical arm, a brick clamping assembly is arranged below the free end of the mechanical arm, and a connecting shaft is fixedly installed on the rear side of the top of the brick clamping assembly. The outer surface of the connecting shaft is rotationally sleeved with a positioning sleeve fixedly connected with the bottom of the free end of the mechanical arm, two protection assemblies arranged in a front-back mirror image mode are installed on the brick clamping assembly, and an overturning assembly used for adjusting the direction of the brick clamping assembly is installed between the mechanical arm and the brick clamping assembly. The brick clamping assembly comprises two side clamping plates which are used for clamping bricks and arranged front and back, and grooves are formed in the bottoms of the two side clamping plates. According to the brick clamping device, when the clamping assembly clamps the brick to ascend, the protection assembly is matched to adjust the protection supporting plate to the position below the brick so as to provide protection for the brick, the situation that the brick straightly falls down when the brick clamping assembly does not clamp the brick is avoided, and then the safety is improved while the loss is effectively reduced.
本发明公开了一种建筑施工立面排砖装置,包括机械臂,以及安装在机械臂底部的滑座组件,所述机械臂自由端的下方设置有夹砖组件,在夹砖组件顶部的后侧固定安装有衔接轴,所述衔接轴的外表面转动套设有与机械臂自由端底部固定连接的定位套筒,所述夹砖组件上安装有两个呈前后镜像布置的防护组件,在机械臂上和夹砖组件之间安装有用于调整夹砖组件方向的翻转组件,所述夹砖组件包括两个用于夹取砖块且呈前后布置的侧夹板,在两个侧夹板的底部均开设有凹槽。本发明中,在夹持组件夹住砖块上升之际,配合防护组件将防护托板调整至砖块的下方为其提供防护,谨防在夹砖组件未夹紧砖块之际,砖块径直往下掉落,继而有效减少损失的同时提高安全性。
Building construction facade brick arranging device
一种建筑施工立面排砖装置
2023-12-29
Patent
Electronic Resource
Chinese
Acid-proof brick facade building structure and construction method thereof
European Patent Office | 2023
|Automated Brick Counting for Façade Construction Progress Estimation
British Library Online Contents | 2015
|Automated Brick Counting for Façade Construction Progress Estimation
Online Contents | 2015
|