Construction method for external pipeline of water distributor of cooling tower
The invention discloses a construction method for an external pipeline of a water distributor of a cooling tower. The construction method comprises the following steps: 1, constructing a cooling tower mounting foundation; 2, a plurality of cooling tower bodies are sequentially hoisted, so that the cooling tower bodies are sequentially installed on the at least two foundation wall bodies; thirdly, two supporting frames used for supporting an external pipeline of the water distributor are installed on the front side and the rear side of the cooling tower body respectively; and 4, constructing an external pipeline of the water distributor. According to the cooling tower, the two supporting frames used for supporting the water distributor external pipeline are installed on the front side and the rear side of the cooling tower body correspondingly, the two supporting frames form a supporting system which is independent of the cooling tower body and used for bearing the water distributor external pipeline on the outer side of the cooling tower body, and the water distributor external pipeline does not need to be installed on the cooling tower body; the load borne by the cooling tower body is reduced, the stability and safety of the cooling tower body are improved, the positioning accuracy of the external pipeline of the water distributor is improved, the construction process is simple and convenient, and the construction period is shortened.
本发明公开了一种冷却塔布水器外接管道施工方法,该施工方法包括:一、施工冷却塔安装基础;二、依次吊装多个冷却塔本体,使多个冷却塔本体依次安装在至少两个所述基础墙体上;三、在冷却塔本体的前后两侧分别安装两个用于支撑布水器外接管道的支撑架;四、施工布水器外接管道。本发明通过在冷却塔本体的前后两侧分别安装两个用于支撑布水器外接管道的支撑架,两个支撑架在冷却塔本体外侧形成了独立于冷却塔本体的承载布水器外接管道的支撑体系,布水器外接管道勿需依托在冷却塔本体上进行安装,降低了冷却塔本体所承受的载荷,有助于提高冷却塔本体的稳固性和安全性,提高了布水器外接管道的定位准确性,施工工艺简便,有助于缩短施工工期。
Construction method for external pipeline of water distributor of cooling tower
The invention discloses a construction method for an external pipeline of a water distributor of a cooling tower. The construction method comprises the following steps: 1, constructing a cooling tower mounting foundation; 2, a plurality of cooling tower bodies are sequentially hoisted, so that the cooling tower bodies are sequentially installed on the at least two foundation wall bodies; thirdly, two supporting frames used for supporting an external pipeline of the water distributor are installed on the front side and the rear side of the cooling tower body respectively; and 4, constructing an external pipeline of the water distributor. According to the cooling tower, the two supporting frames used for supporting the water distributor external pipeline are installed on the front side and the rear side of the cooling tower body correspondingly, the two supporting frames form a supporting system which is independent of the cooling tower body and used for bearing the water distributor external pipeline on the outer side of the cooling tower body, and the water distributor external pipeline does not need to be installed on the cooling tower body; the load borne by the cooling tower body is reduced, the stability and safety of the cooling tower body are improved, the positioning accuracy of the external pipeline of the water distributor is improved, the construction process is simple and convenient, and the construction period is shortened.
本发明公开了一种冷却塔布水器外接管道施工方法,该施工方法包括:一、施工冷却塔安装基础;二、依次吊装多个冷却塔本体,使多个冷却塔本体依次安装在至少两个所述基础墙体上;三、在冷却塔本体的前后两侧分别安装两个用于支撑布水器外接管道的支撑架;四、施工布水器外接管道。本发明通过在冷却塔本体的前后两侧分别安装两个用于支撑布水器外接管道的支撑架,两个支撑架在冷却塔本体外侧形成了独立于冷却塔本体的承载布水器外接管道的支撑体系,布水器外接管道勿需依托在冷却塔本体上进行安装,降低了冷却塔本体所承受的载荷,有助于提高冷却塔本体的稳固性和安全性,提高了布水器外接管道的定位准确性,施工工艺简便,有助于缩短施工工期。
Construction method for external pipeline of water distributor of cooling tower
一种冷却塔布水器外接管道施工方法
LIU JINGWEI (author) / SU BO (author) / CUI JIANQIANG (author) / YANG RAN (author) / DENG JIAN (author) / YANG XIONGSHUO (author) / YANG TING (author) / YU GANG (author) / CUI XIAODAN (author) / WANG SHUAI (author)
2023-12-29