A platform for research: civil engineering, architecture and urbanism
Municipal highway tunnel road maintenance and reinforcement equipment
The invention discloses municipal road tunnel road maintenance and reinforcement equipment which structurally comprises a handle, a charging barrel, a grouting pipeline, a movable base and a power assisting body, the handle is fixedly connected to the upper portion of the movable base, the charging barrel and the grouting pipeline are installed on the upper portion of the movable base, and the power assisting body is arranged on the lower portion of the movable base; a grouting pipeline and a power assisting body are arranged below the movable base, and when the grouting pipeline and the power assisting body move forwards along a crack opening on the movable base, the edge of the bottom of the grouting pipeline is used for winding and removing impurities in a crack at first, and the grouting pipeline is suspended on the crack in an accurate freeze-frame mode to spray cement grouting; then the assisting body is dragged to forcefully press the opening of the crack, and the cement grout is further paved and filled in the crack, so that the phenomenon that the cement grout overflows out of the crack excessively and consequently the road surface is uneven is prevented, and the cement grout is helped to efficiently fill the crack in a solid state.
本发明公开了一种市政公路隧道道路维修加固设备,其结构包括扶把、料筒、灌浆管道、移动底座、助力体,扶把固定连接在移动底座上方,移动底座上方安装有料筒和灌浆管道,且移动底座下方设置有助力体;在移动底座下设有灌浆管道和助力体,利用灌浆管道和助力体在移动底座顺延着裂缝开口前进的同时,会让灌浆管道底部边缘先对裂缝内部的杂质进行卷带清除,并精准定格的悬于裂缝上喷发水泥灌浆,再牵扯助力体倾向有力的按压在裂缝开口上,把水泥灌浆进一步铺平填实在裂缝内部,以防过量溢出裂缝,从而出现路面凹凸不平的现象,有助于水泥灌浆以实心状态对裂缝进行高效填补。
Municipal highway tunnel road maintenance and reinforcement equipment
The invention discloses municipal road tunnel road maintenance and reinforcement equipment which structurally comprises a handle, a charging barrel, a grouting pipeline, a movable base and a power assisting body, the handle is fixedly connected to the upper portion of the movable base, the charging barrel and the grouting pipeline are installed on the upper portion of the movable base, and the power assisting body is arranged on the lower portion of the movable base; a grouting pipeline and a power assisting body are arranged below the movable base, and when the grouting pipeline and the power assisting body move forwards along a crack opening on the movable base, the edge of the bottom of the grouting pipeline is used for winding and removing impurities in a crack at first, and the grouting pipeline is suspended on the crack in an accurate freeze-frame mode to spray cement grouting; then the assisting body is dragged to forcefully press the opening of the crack, and the cement grout is further paved and filled in the crack, so that the phenomenon that the cement grout overflows out of the crack excessively and consequently the road surface is uneven is prevented, and the cement grout is helped to efficiently fill the crack in a solid state.
本发明公开了一种市政公路隧道道路维修加固设备,其结构包括扶把、料筒、灌浆管道、移动底座、助力体,扶把固定连接在移动底座上方,移动底座上方安装有料筒和灌浆管道,且移动底座下方设置有助力体;在移动底座下设有灌浆管道和助力体,利用灌浆管道和助力体在移动底座顺延着裂缝开口前进的同时,会让灌浆管道底部边缘先对裂缝内部的杂质进行卷带清除,并精准定格的悬于裂缝上喷发水泥灌浆,再牵扯助力体倾向有力的按压在裂缝开口上,把水泥灌浆进一步铺平填实在裂缝内部,以防过量溢出裂缝,从而出现路面凹凸不平的现象,有助于水泥灌浆以实心状态对裂缝进行高效填补。
Municipal highway tunnel road maintenance and reinforcement equipment
一种市政公路隧道道路维修加固设备
KUANG YUANHUA (author) / YANG JUN (author) / TIAN LI (author)
2024-01-05
Patent
Electronic Resource
Chinese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Municipal road maintenance, cleaning and recycling equipment
European Patent Office | 2022
|