A platform for research: civil engineering, architecture and urbanism
Inclined wall and stair integrated cast-in-place construction method
The invention discloses an inclined wall and stair integrated cast-in-place construction method, and belongs to the technical field of building construction. The construction method comprises the steps that S1, inclined wall baffles are built side by side at the inclined wall construction position, and the space between the two inclined wall baffles is an inclined wall pouring space; and S2, a plurality of main connecting steel bars are horizontally inserted into the inclined wall baffle, the main connecting steel bars are rigidly and fixedly connected with the inclined wall baffle, one ends of the main connecting steel bars extend to the inclined wall pouring space, and the other ends of the main connecting steel bars extend in the direction away from the inclined wall baffle. The inclined wall and the stair can be poured at the same time in one-time pouring operation, the inclined wall and the stair are integrally formed after pouring is completed, and therefore the inclined wall and the stair do not need to be independently constructed, and the construction efficiency is greatly improved.
本发明公开了斜墙与楼梯一体现浇施工方法,属于建筑施工技术领域。施工方法包括S1:在斜墙施工处并排搭建斜墙挡板,两个斜墙挡板之间空间为斜墙浇筑空间;S2:向斜墙挡板内水平插入设置若干个主连接钢筋,主连接钢筋与斜墙挡板刚性固定连接,主连接钢筋的一端延伸至斜墙浇筑空间,主连接钢筋的另一端朝向远离斜墙挡板的方向延伸。本发明能够在一次浇筑作业中同时对斜墙以及楼梯同时进行浇筑,浇筑完成后斜墙与楼梯一体成形,从而无需对斜墙和楼梯单独进行施工,大大提高了施工效率。
Inclined wall and stair integrated cast-in-place construction method
The invention discloses an inclined wall and stair integrated cast-in-place construction method, and belongs to the technical field of building construction. The construction method comprises the steps that S1, inclined wall baffles are built side by side at the inclined wall construction position, and the space between the two inclined wall baffles is an inclined wall pouring space; and S2, a plurality of main connecting steel bars are horizontally inserted into the inclined wall baffle, the main connecting steel bars are rigidly and fixedly connected with the inclined wall baffle, one ends of the main connecting steel bars extend to the inclined wall pouring space, and the other ends of the main connecting steel bars extend in the direction away from the inclined wall baffle. The inclined wall and the stair can be poured at the same time in one-time pouring operation, the inclined wall and the stair are integrally formed after pouring is completed, and therefore the inclined wall and the stair do not need to be independently constructed, and the construction efficiency is greatly improved.
本发明公开了斜墙与楼梯一体现浇施工方法,属于建筑施工技术领域。施工方法包括S1:在斜墙施工处并排搭建斜墙挡板,两个斜墙挡板之间空间为斜墙浇筑空间;S2:向斜墙挡板内水平插入设置若干个主连接钢筋,主连接钢筋与斜墙挡板刚性固定连接,主连接钢筋的一端延伸至斜墙浇筑空间,主连接钢筋的另一端朝向远离斜墙挡板的方向延伸。本发明能够在一次浇筑作业中同时对斜墙以及楼梯同时进行浇筑,浇筑完成后斜墙与楼梯一体成形,从而无需对斜墙和楼梯单独进行施工,大大提高了施工效率。
Inclined wall and stair integrated cast-in-place construction method
斜墙与楼梯一体现浇施工方法
YANG DAWEI (author) / LI HUA (author) / KONG LINGBO (author) / SHEN JIANGHUI (author) / HOU QIANLI (author) / LIN WANGJIAN (author) / SHI YANQIU (author) / QU FENGJIE (author) / HAN MIN (author) / LU CHANG (author)
2024-01-05
Patent
Electronic Resource
Chinese
Cast-in-place stair formwork system and construction method
European Patent Office | 2024
|Wall structure on stair inclined steel beam and construction method
European Patent Office | 2021
|