Overwater displacement operation method of overwater large-span hoisting equipment
The invention discloses an overwater displacement operation method for overwater large-span hoisting equipment. The method is realized on the basis of an operation foundation platform and a movable foundation platform which are arranged on each single side of the overwater large-span hoisting equipment side by side; two sets of sliding rails are symmetrically laid on the top face of each foundation platform in the spanning direction perpendicular to the hoisting equipment. On the operation foundation platform, the two winches are arranged on one set of sliding rails in a sliding mode, and the two towers arranged side by side are arranged on the other set of sliding rails in a sliding mode. In practical application, the operation foundation platform and the movable foundation platform alternately perform transverse displacement until the operation foundation platform reaches the construction position of the next row of single-row photovoltaic facilities; according to the overwater displacement operation method of the overwater large-span hoisting equipment, the displacement process of the overwater large-span hoisting equipment has the advantages of being easy to operate, low in construction cost and capable of being repeatedly used, and the field construction efficiency can be effectively improved in the overwater photovoltaic construction process.
本发明公开了一种水上大跨度起重设备水上移位作业方法,其基于并排设置在水上大跨度起重设备每个单侧的作业基础平台和移动基础平台实现;在每个基础平台的顶面上,沿垂直于起重设备的跨设方向对称铺设有两套滑轨;在作业基础平台上,两台卷扬机滑动设置的一套滑轨上,两个并排设置的塔架滑动设置在另一套滑轨上;在实际应用中,通过作业基础平台与移动基础平台交替进行横向移位,直至作业基础平台到达下一排单排光伏设施的施工位置;该水上大跨度起重设备水上移位作业方法该水上大跨度起重设备移位工艺具有操作简单,施工成本低,可重复利用的优点,在水上光伏施工过程中可有效提高现场施工效率。
Overwater displacement operation method of overwater large-span hoisting equipment
The invention discloses an overwater displacement operation method for overwater large-span hoisting equipment. The method is realized on the basis of an operation foundation platform and a movable foundation platform which are arranged on each single side of the overwater large-span hoisting equipment side by side; two sets of sliding rails are symmetrically laid on the top face of each foundation platform in the spanning direction perpendicular to the hoisting equipment. On the operation foundation platform, the two winches are arranged on one set of sliding rails in a sliding mode, and the two towers arranged side by side are arranged on the other set of sliding rails in a sliding mode. In practical application, the operation foundation platform and the movable foundation platform alternately perform transverse displacement until the operation foundation platform reaches the construction position of the next row of single-row photovoltaic facilities; according to the overwater displacement operation method of the overwater large-span hoisting equipment, the displacement process of the overwater large-span hoisting equipment has the advantages of being easy to operate, low in construction cost and capable of being repeatedly used, and the field construction efficiency can be effectively improved in the overwater photovoltaic construction process.
本发明公开了一种水上大跨度起重设备水上移位作业方法,其基于并排设置在水上大跨度起重设备每个单侧的作业基础平台和移动基础平台实现;在每个基础平台的顶面上,沿垂直于起重设备的跨设方向对称铺设有两套滑轨;在作业基础平台上,两台卷扬机滑动设置的一套滑轨上,两个并排设置的塔架滑动设置在另一套滑轨上;在实际应用中,通过作业基础平台与移动基础平台交替进行横向移位,直至作业基础平台到达下一排单排光伏设施的施工位置;该水上大跨度起重设备水上移位作业方法该水上大跨度起重设备移位工艺具有操作简单,施工成本低,可重复利用的优点,在水上光伏施工过程中可有效提高现场施工效率。
Overwater displacement operation method of overwater large-span hoisting equipment
水上大跨度起重设备水上移位作业方法
CHEN QIANG (author) / LI XUBIN (author) / DONG GUOHUA (author) / HE FUBO (author) / ZHANG DEQIANG (author) / GUO JINXING (author) / YANG SUCHUN (author) / JI HOUJIE (author) / WANG HAO (author) / ZHANG SHIZHAO (author)
2024-01-09
Patent
Electronic Resource
Chinese