Building reinforcing and deviation rectifying structure and reinforcing and deviation rectifying method
The invention relates to the field of building construction, and discloses a building reinforcing and deviation rectifying structure and method.The building reinforcing and deviation rectifying structure comprises a bearing platform used for being arranged on a foundation of a to-be-rectified part of a building, and the bearing platform is provided with a pile pressing hole; the pile sealing pipe is used for being arranged in the pile pressing hole; the reinforcing pile is used for penetrating through the pile sealing pipe and extending into the foundation of the to-be-corrected part; the pile pressing frame is used for being arranged above the bearing platform and used for being connected with the bearing platform; the pressurizing devices are used for being arranged on the pile pressing frame and connected with the reinforcing piles so as to drive the corresponding reinforcing piles to move towards the interior of the foundation; the device further comprises a connecting piece and two reinforcing beams, the two reinforcing beams are used for being clamped to the two sides of the to-be-rectified part, and the connecting piece is used for penetrating through the to-be-rectified part and being connected with the two reinforcing beams. Compared with a method for correcting the deviation of the building through a jacking deviation correcting method, the building reinforcing deviation correcting structure is used for correcting the deviation of the building, and the deviation correcting cost is lower.
本发明涉及建筑施工领域,公开一种建筑物加固纠偏结构及加固纠偏方法,建筑物加固纠偏结构包括:承台,用于设置在建筑物待纠偏部分的基础上,承台设置有压桩孔;封桩管,用于设置于压桩孔内;加固桩,用于穿过封桩管,并伸入待纠偏部分的地基内;压桩架,压桩架用于设置于承台上方,并用于与承台相连;加压装置,加压装置用于设置于压桩架上,并用于与加固桩相连,以驱动其所对应的加固桩向地基内部移动;还包括连接件和两个加固梁,两个加固梁用于夹紧于待纠偏部分的两侧,连接件用于穿过待纠偏部分,并用于与两个加固梁均相连。与利用顶升纠偏法对建筑进行纠偏相比,利用本发明提供的建筑物加固纠偏结构对建筑物进行纠偏,纠偏成本更低。
Building reinforcing and deviation rectifying structure and reinforcing and deviation rectifying method
The invention relates to the field of building construction, and discloses a building reinforcing and deviation rectifying structure and method.The building reinforcing and deviation rectifying structure comprises a bearing platform used for being arranged on a foundation of a to-be-rectified part of a building, and the bearing platform is provided with a pile pressing hole; the pile sealing pipe is used for being arranged in the pile pressing hole; the reinforcing pile is used for penetrating through the pile sealing pipe and extending into the foundation of the to-be-corrected part; the pile pressing frame is used for being arranged above the bearing platform and used for being connected with the bearing platform; the pressurizing devices are used for being arranged on the pile pressing frame and connected with the reinforcing piles so as to drive the corresponding reinforcing piles to move towards the interior of the foundation; the device further comprises a connecting piece and two reinforcing beams, the two reinforcing beams are used for being clamped to the two sides of the to-be-rectified part, and the connecting piece is used for penetrating through the to-be-rectified part and being connected with the two reinforcing beams. Compared with a method for correcting the deviation of the building through a jacking deviation correcting method, the building reinforcing deviation correcting structure is used for correcting the deviation of the building, and the deviation correcting cost is lower.
本发明涉及建筑施工领域,公开一种建筑物加固纠偏结构及加固纠偏方法,建筑物加固纠偏结构包括:承台,用于设置在建筑物待纠偏部分的基础上,承台设置有压桩孔;封桩管,用于设置于压桩孔内;加固桩,用于穿过封桩管,并伸入待纠偏部分的地基内;压桩架,压桩架用于设置于承台上方,并用于与承台相连;加压装置,加压装置用于设置于压桩架上,并用于与加固桩相连,以驱动其所对应的加固桩向地基内部移动;还包括连接件和两个加固梁,两个加固梁用于夹紧于待纠偏部分的两侧,连接件用于穿过待纠偏部分,并用于与两个加固梁均相连。与利用顶升纠偏法对建筑进行纠偏相比,利用本发明提供的建筑物加固纠偏结构对建筑物进行纠偏,纠偏成本更低。
Building reinforcing and deviation rectifying structure and reinforcing and deviation rectifying method
一种建筑物加固纠偏结构及加固纠偏方法
GONG JIE (author) / TU KEYAN (author) / HUANG ZEKUN (author)
2024-01-09
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2023
|Deviation rectifying and reinforcing mechanism for base building
European Patent Office | 2020
|Ground beam reinforcing structure in building deviation rectifying process
European Patent Office | 2022
|Deviation rectifying and reinforcing process for existing building
European Patent Office | 2023
|Deviation rectifying and reinforcing structure for shallow foundation building
European Patent Office | 2024
|