A platform for research: civil engineering, architecture and urbanism
Quakeproof stop block for steel cable connection and construction method of quakeproof stop block
The invention relates to the technical field of bridge quakeproof, and discloses a steel cable connected quakeproof check block and a construction method thereof.The steel cable connected quakeproof check block comprises a check block body, the bottom of the check block body is movably attached to the top face of a cover beam, the top of the check block body is higher than the bottom of a main beam, and a cavity with an opening is formed in the bottom of the check block body; the inhaul cable comprises a protruding section and buried sections located on the two sides of the protruding section respectively, the protruding section is located in the cavity, the top of the protruding section is buried in the check block body, and the two buried sections are both buried in the bent cap. The stop block has the effects of buffering impact between a main beam and the stop block body and improving the reliability of a bridge.
本申请涉及桥梁防震技术领域,公开了一种钢缆连接的防震挡块及其施工方法,一种钢缆连接的防震挡块包括挡块本体,其底部活动贴合于盖梁顶面,且其顶部高于主梁底部,所述挡块本体底部设有开口的空腔;拉索,其包括凸起段和分别位于凸起段两侧的埋设段,所述凸起段位于所述空腔内,且顶部埋设于所述挡块本体内,两段所述埋设段均埋设于盖梁内。本发明具有缓冲主梁和挡块本体之间的冲击,提高了桥梁可靠性的效果。
Quakeproof stop block for steel cable connection and construction method of quakeproof stop block
The invention relates to the technical field of bridge quakeproof, and discloses a steel cable connected quakeproof check block and a construction method thereof.The steel cable connected quakeproof check block comprises a check block body, the bottom of the check block body is movably attached to the top face of a cover beam, the top of the check block body is higher than the bottom of a main beam, and a cavity with an opening is formed in the bottom of the check block body; the inhaul cable comprises a protruding section and buried sections located on the two sides of the protruding section respectively, the protruding section is located in the cavity, the top of the protruding section is buried in the check block body, and the two buried sections are both buried in the bent cap. The stop block has the effects of buffering impact between a main beam and the stop block body and improving the reliability of a bridge.
本申请涉及桥梁防震技术领域,公开了一种钢缆连接的防震挡块及其施工方法,一种钢缆连接的防震挡块包括挡块本体,其底部活动贴合于盖梁顶面,且其顶部高于主梁底部,所述挡块本体底部设有开口的空腔;拉索,其包括凸起段和分别位于凸起段两侧的埋设段,所述凸起段位于所述空腔内,且顶部埋设于所述挡块本体内,两段所述埋设段均埋设于盖梁内。本发明具有缓冲主梁和挡块本体之间的冲击,提高了桥梁可靠性的效果。
Quakeproof stop block for steel cable connection and construction method of quakeproof stop block
一种钢缆连接的防震挡块及其施工方法
YU SHUNXIN (author) / XIA FEI (author) / CHEN JINZHOU (author) / LI QIAN (author) / WANG ZHIGANG (author) / WU DAJIAN (author) / CHEN HONGZHUO (author) / ZHANG HONGMIN (author)
2024-01-12
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Construction device and method for dismounting and mounting quakeproof anti-falling beam stop block
European Patent Office | 2020
|Quakeproof prefabricated roof and quakeproof mounting method
European Patent Office | 2023
|Quakeproof stairway with combined structure and construction method of quakeproof stairway
European Patent Office | 2015
|Quakeproof buffering device for bridge design and quakeproof method
European Patent Office | 2023
|