A platform for research: civil engineering, architecture and urbanism
Lifting device for building construction
The invention discloses a lifting device for building construction, which comprises an operation plate, the bottom of the operation plate is provided with a support rod, the lifting device also comprises a lifting bucket, the lifting bucket is arranged on the top of the operation plate, is used for transferring and placing bricks in sequence, and the lifting bucket moves through a lifting rod; the supporting platform is arranged on one side of the lifting hopper and used for supporting an operator to conduct building construction operation, the lifting unit is adopted, bricks are orderly placed in the first containing groove and the second containing groove, the bricks are made to move circumferentially at the constant speed during operation, and therefore the operator can conveniently conduct building construction on the bricks through the lifting unit when the bricks conduct building construction. According to the brick feeding device, the bricks can be used in order, after one-time use of the bricks is finished, the bricks can be restored to the initial position to be supplied again, the bricks are fed again to be used, and therefore the problem that existing bricks cannot be supplied in time and are inconvenient to take is effectively solved, timely brick supply is achieved, and operation of an operator can be facilitated.
本申请公开了一种建筑施工用升降装置,包括操作板,所述操作板的底部设有支撑杆,还包括:升降斗,所述升降斗设于操作板的顶部,用于转运并将砖块按照顺序摆放,且所述升降斗通过升降杆移动;支撑平台,所述支撑平台设于升降斗的一侧,用于支撑操作工进行建筑施工操作,采用了升降单元,通过将砖块有序的摆放到第一放置槽和第二放置槽内,并在进行操作时使其匀速的圆周运动,方便操作人员在那砖块进行建筑施工时,使砖块有序的被使用,一次砖块使用结束后,可以再次恢复到初始位置进行砖块的补给,使其再次上料进行使用,所以,有效解决了现有的砖块不能及时供给并不方便拿取的问题,实现了及时砖块供给并能够方便操作者操作。
Lifting device for building construction
The invention discloses a lifting device for building construction, which comprises an operation plate, the bottom of the operation plate is provided with a support rod, the lifting device also comprises a lifting bucket, the lifting bucket is arranged on the top of the operation plate, is used for transferring and placing bricks in sequence, and the lifting bucket moves through a lifting rod; the supporting platform is arranged on one side of the lifting hopper and used for supporting an operator to conduct building construction operation, the lifting unit is adopted, bricks are orderly placed in the first containing groove and the second containing groove, the bricks are made to move circumferentially at the constant speed during operation, and therefore the operator can conveniently conduct building construction on the bricks through the lifting unit when the bricks conduct building construction. According to the brick feeding device, the bricks can be used in order, after one-time use of the bricks is finished, the bricks can be restored to the initial position to be supplied again, the bricks are fed again to be used, and therefore the problem that existing bricks cannot be supplied in time and are inconvenient to take is effectively solved, timely brick supply is achieved, and operation of an operator can be facilitated.
本申请公开了一种建筑施工用升降装置,包括操作板,所述操作板的底部设有支撑杆,还包括:升降斗,所述升降斗设于操作板的顶部,用于转运并将砖块按照顺序摆放,且所述升降斗通过升降杆移动;支撑平台,所述支撑平台设于升降斗的一侧,用于支撑操作工进行建筑施工操作,采用了升降单元,通过将砖块有序的摆放到第一放置槽和第二放置槽内,并在进行操作时使其匀速的圆周运动,方便操作人员在那砖块进行建筑施工时,使砖块有序的被使用,一次砖块使用结束后,可以再次恢复到初始位置进行砖块的补给,使其再次上料进行使用,所以,有效解决了现有的砖块不能及时供给并不方便拿取的问题,实现了及时砖块供给并能够方便操作者操作。
Lifting device for building construction
一种建筑施工用升降装置
YAN XING (author) / CHEN YUEXIN (author) / CHEN XIAOXIAN (author) / WANG SIJIE (author) / ZHANG YING (author) / YEE CASSIAN (author) / YANG QISONG (author)
2024-01-12
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste