A platform for research: civil engineering, architecture and urbanism
Anti-falling device for bridge construction
The invention discloses a bridge construction anti-falling device, and belongs to the technical field of construction anti-falling devices, the bridge construction anti-falling device comprises two first protective shells, driving assemblies arranged in the first protective shells, linkage assemblies symmetrically connected to the two sides of the first protective shells, and protective assemblies connected to the driving assemblies; wherein the protection assembly comprises two layers of protection nets, the two layers of protection nets are connected through a plurality of connecting ropes, iron wire ropes are symmetrically connected to the outer portion of the splicing cloth, and lifting assemblies are connected to the ends, away from the connecting ropes, of the iron wire ropes; during placement, the overall height of the protection assembly can be determined according to the height of a bridge and the on-site construction environment, the protection assembly is arranged on the ground on the two sides of bridge construction, after a worker accidentally falls off, the worker is protected through the two layers of protection nets, the protection nets are driven by the lifting assembly to move downwards, and the safety of the worker is improved. And after the protective net supports the constructor to be close to the ground, the constructor returns to the ground.
本发明公开了一种桥梁施工防落装置,属于施工防跌落装置技术领域,包括:两个防护壳体一、设置于防护壳体一内的驱动组件、对称连接于防护壳体一两侧的联动组件、连接于驱动组件上的防护组件;其中,防护组件包括两层防护网,两层所述防护网通过多个接绳相连接,所述拼接布的外部对称连接有铁丝绳,所述铁丝绳远离接绳的一端连接有升降组件;本发明中,在放置时,可根据桥梁的高度及现场的施工环境来决定防护组件的整体高度,通过将防护组件设置于桥梁施工两侧的地面上,当工作人员意外跌落后,通过两层防护网对工作人员进行防护,通过升降组件带动防护网向下移动,直至防护网托住施工人员距离地面较近后,施工人员再回到地面上即可。
Anti-falling device for bridge construction
The invention discloses a bridge construction anti-falling device, and belongs to the technical field of construction anti-falling devices, the bridge construction anti-falling device comprises two first protective shells, driving assemblies arranged in the first protective shells, linkage assemblies symmetrically connected to the two sides of the first protective shells, and protective assemblies connected to the driving assemblies; wherein the protection assembly comprises two layers of protection nets, the two layers of protection nets are connected through a plurality of connecting ropes, iron wire ropes are symmetrically connected to the outer portion of the splicing cloth, and lifting assemblies are connected to the ends, away from the connecting ropes, of the iron wire ropes; during placement, the overall height of the protection assembly can be determined according to the height of a bridge and the on-site construction environment, the protection assembly is arranged on the ground on the two sides of bridge construction, after a worker accidentally falls off, the worker is protected through the two layers of protection nets, the protection nets are driven by the lifting assembly to move downwards, and the safety of the worker is improved. And after the protective net supports the constructor to be close to the ground, the constructor returns to the ground.
本发明公开了一种桥梁施工防落装置,属于施工防跌落装置技术领域,包括:两个防护壳体一、设置于防护壳体一内的驱动组件、对称连接于防护壳体一两侧的联动组件、连接于驱动组件上的防护组件;其中,防护组件包括两层防护网,两层所述防护网通过多个接绳相连接,所述拼接布的外部对称连接有铁丝绳,所述铁丝绳远离接绳的一端连接有升降组件;本发明中,在放置时,可根据桥梁的高度及现场的施工环境来决定防护组件的整体高度,通过将防护组件设置于桥梁施工两侧的地面上,当工作人员意外跌落后,通过两层防护网对工作人员进行防护,通过升降组件带动防护网向下移动,直至防护网托住施工人员距离地面较近后,施工人员再回到地面上即可。
Anti-falling device for bridge construction
一种桥梁施工防落装置
YIN XUELIANG (author)
2024-01-16
Patent
Electronic Resource
Chinese