A platform for research: civil engineering, architecture and urbanism
Pile forming process of drainage rigid pile in drainage anti-liquefaction coral reef sand foundation
The invention discloses a drainage anti-liquefaction coral reef sand foundation drainage rigid pile forming technology which comprises a base forming box, a foundation pile pouring device and a drainage rigid pile forming device, the base forming box, the foundation pile pouring device and the drainage rigid pile forming device are arranged, and a connecting and fixing mechanism is arranged at the bottom of the outer side of the foundation pile pouring device; the base forming box is quickly connected and fixed through the connecting and fixing mechanism, a water pumping pipe assembly is arranged in the foundation pile pouring device to pump water in the base forming box, and concrete is injected into the base forming box through a pouring pipe of the foundation pile pouring device, so that a concrete base is formed by the base forming box; the drainage rigid pile forming device is connected with the base forming box of the poured and formed concrete base, the drainage rigid pile is formed in the drainage rigid pile forming device in a pouring mode, the pouring convenience of the drainage rigid pile is improved, the stabilizing effect of a foundation pile of the drainage rigid pile is improved, and then the strength of the drainage rigid pile is improved.
本发明公开了排水抗液化珊瑚礁砂地基中排水刚性桩成桩工艺,包括基座成型箱、基桩浇筑装置和排水刚性桩成型装置,通过设置了基座成型箱、基桩浇筑装置和排水刚性桩成型装置,基桩浇筑装置外侧底部设置有连接固定机构,通过连接固定机构与基座成型箱进行快速连接固定,基桩浇筑装置的内部设置有抽水管组件对基座成型箱内进行抽水,通过基桩浇筑装置的浇筑管对基座成型箱内注入混凝土,使基座成型箱形成混凝土基座,通过排水刚性桩成型装置与浇筑成型后混凝土基座的基座成型箱连接,在排水刚性桩成型装置内浇筑形成排水刚性桩,增加排水刚性桩的浇筑便捷性,且增加排水刚性桩的基桩的稳固效果,进而增加排水刚性桩的强度。
Pile forming process of drainage rigid pile in drainage anti-liquefaction coral reef sand foundation
The invention discloses a drainage anti-liquefaction coral reef sand foundation drainage rigid pile forming technology which comprises a base forming box, a foundation pile pouring device and a drainage rigid pile forming device, the base forming box, the foundation pile pouring device and the drainage rigid pile forming device are arranged, and a connecting and fixing mechanism is arranged at the bottom of the outer side of the foundation pile pouring device; the base forming box is quickly connected and fixed through the connecting and fixing mechanism, a water pumping pipe assembly is arranged in the foundation pile pouring device to pump water in the base forming box, and concrete is injected into the base forming box through a pouring pipe of the foundation pile pouring device, so that a concrete base is formed by the base forming box; the drainage rigid pile forming device is connected with the base forming box of the poured and formed concrete base, the drainage rigid pile is formed in the drainage rigid pile forming device in a pouring mode, the pouring convenience of the drainage rigid pile is improved, the stabilizing effect of a foundation pile of the drainage rigid pile is improved, and then the strength of the drainage rigid pile is improved.
本发明公开了排水抗液化珊瑚礁砂地基中排水刚性桩成桩工艺,包括基座成型箱、基桩浇筑装置和排水刚性桩成型装置,通过设置了基座成型箱、基桩浇筑装置和排水刚性桩成型装置,基桩浇筑装置外侧底部设置有连接固定机构,通过连接固定机构与基座成型箱进行快速连接固定,基桩浇筑装置的内部设置有抽水管组件对基座成型箱内进行抽水,通过基桩浇筑装置的浇筑管对基座成型箱内注入混凝土,使基座成型箱形成混凝土基座,通过排水刚性桩成型装置与浇筑成型后混凝土基座的基座成型箱连接,在排水刚性桩成型装置内浇筑形成排水刚性桩,增加排水刚性桩的浇筑便捷性,且增加排水刚性桩的基桩的稳固效果,进而增加排水刚性桩的强度。
Pile forming process of drainage rigid pile in drainage anti-liquefaction coral reef sand foundation
排水抗液化珊瑚礁砂地基中排水刚性桩成桩工艺
CHEN ZHIXIONG (author) / SHI PENG (author) / OU QIANG (author) / YAN WENLONG (author) / ZHOU YANOU (author) / CHENG YIN (author) / HUA HAICHENG (author) / HU XIN (author) / LU JINLING (author) / ZHU ZHIWEI (author)
2024-01-19
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Prefabricated drainage rigid pile based on coral reef sand foundation and construction method
European Patent Office | 2023
|Anti-liquefaction three-dimensional drainage rigid pile and construction method thereof
European Patent Office | 2015
|