Water interception and drainage structure in main building of high-rise building and water interception and drainage method of water interception and drainage structure
The invention discloses a water interception and drainage structure in a main building of a high-rise building and a water interception and drainage method thereof.The water interception and drainage structure comprises a protection platform, the protection platform comprises a bedplate and a bearing frame supported on the bedplate, a bracket is formed on the side portion of the bearing frame, and the bracket extends to an elevator door opening of a protection floor and is placed on a floor plate of the protection floor; a flow guide notch is formed in the side, away from the elevator door opening, of the platen. The first water receiving tank is mounted on the inner wall of the elevator shaft and is arranged below the flow guide notch of the protection platform; the assembly type staircase is installed in the staircase of the protection floor, a water dripping groove is formed in the bottom of the assembly type staircase, and the second water tank is installed on the assembly type staircase and arranged below the water dripping groove; and the third water receiving tank is installed on the outer vertical face of the protection floor, and the third water receiving tank is arranged in a circle in the circumferential direction of the main building. The problems that when an existing high-rise building main structure is constructed, a main building hole cannot be closed in time, a large amount of water is accumulated in a main building room, and inter-building construction and finished product protection are not facilitated are solved.
本发明公开了一种高层建筑的主楼内截排水结构及其截排水方法,包括:防护平台,包括台板和支撑于台板的支承架,支承架的侧部形成有牛腿,牛腿伸至防护楼层的电梯门洞并搁置于防护楼层的楼层板,台板的远离电梯门洞的一侧形成有导流缺口;第一接水槽,安装于电梯井的内壁且设置于防护平台的导流缺口的下方;第二接水槽,防护楼层的楼梯间内安装有装配式楼梯,装配式楼梯的底部形成有滴水槽,第二水槽安装于装配式楼梯且设置于滴水槽的下方;第三接水槽,安装于防护楼层的外立面,第三接水槽沿主楼的周向方向设置一圈。本发明解决了现有高层建筑主体结构施工时,主楼洞口无法及时封闭,导致主楼室内大量积水,不利于楼内穿插施工与成品保护的问题。
Water interception and drainage structure in main building of high-rise building and water interception and drainage method of water interception and drainage structure
The invention discloses a water interception and drainage structure in a main building of a high-rise building and a water interception and drainage method thereof.The water interception and drainage structure comprises a protection platform, the protection platform comprises a bedplate and a bearing frame supported on the bedplate, a bracket is formed on the side portion of the bearing frame, and the bracket extends to an elevator door opening of a protection floor and is placed on a floor plate of the protection floor; a flow guide notch is formed in the side, away from the elevator door opening, of the platen. The first water receiving tank is mounted on the inner wall of the elevator shaft and is arranged below the flow guide notch of the protection platform; the assembly type staircase is installed in the staircase of the protection floor, a water dripping groove is formed in the bottom of the assembly type staircase, and the second water tank is installed on the assembly type staircase and arranged below the water dripping groove; and the third water receiving tank is installed on the outer vertical face of the protection floor, and the third water receiving tank is arranged in a circle in the circumferential direction of the main building. The problems that when an existing high-rise building main structure is constructed, a main building hole cannot be closed in time, a large amount of water is accumulated in a main building room, and inter-building construction and finished product protection are not facilitated are solved.
本发明公开了一种高层建筑的主楼内截排水结构及其截排水方法,包括:防护平台,包括台板和支撑于台板的支承架,支承架的侧部形成有牛腿,牛腿伸至防护楼层的电梯门洞并搁置于防护楼层的楼层板,台板的远离电梯门洞的一侧形成有导流缺口;第一接水槽,安装于电梯井的内壁且设置于防护平台的导流缺口的下方;第二接水槽,防护楼层的楼梯间内安装有装配式楼梯,装配式楼梯的底部形成有滴水槽,第二水槽安装于装配式楼梯且设置于滴水槽的下方;第三接水槽,安装于防护楼层的外立面,第三接水槽沿主楼的周向方向设置一圈。本发明解决了现有高层建筑主体结构施工时,主楼洞口无法及时封闭,导致主楼室内大量积水,不利于楼内穿插施工与成品保护的问题。
Water interception and drainage structure in main building of high-rise building and water interception and drainage method of water interception and drainage structure
高层建筑的主楼内截排水结构及其截排水方法
CHEN PENGZHAN (author) / SONG TENGFEI (author) / QIU SHUAIJIE (author) / FU XINPENG (author) / LIU SAI (author) / XIA ZHENGXI (author) / TIAN HENGTAO (author) / CAO YUE (author)
2024-01-23
Patent
Electronic Resource
Chinese
Drainage device integrating sewage interception and flood drainage
European Patent Office | 2023
|Embankment-road combined comprehensive water interception and drainage system
European Patent Office | 2022
|