A platform for research: civil engineering, architecture and urbanism
Head-closing anti-seepage construction process for laying waterproof coiled material along wall
The invention discloses a head-closing anti-seepage construction process for laying a waterproof coiled material along a wall. The head-closing anti-seepage construction process for laying the waterproof coiled material along the wall comprises the following steps that firstly, the waterproof coiled material is laid to a preset height along the wall according to the construction process; secondly, an anti-seepage water pressure strip is fixedly installed along the head closing position of the top end of the waterproof coiled material, and one side of the anti-seepage water pressure strip is higher than the top end of the waterproof coiled material during installation; thirdly, a shallow groove defined by the portion, higher than the top end of the waterproof coiled material, of the seepage-proof water pressure strip, the wall and the top of the waterproof coiled material is filled with a weather-proof waterproof sealing material; and 4, naturally drying the weather-proof and waterproof sealing material in the shallow slot, so that the weather-proof and waterproof sealing material is converted into a non-cured weather-proof high-viscosity elastomer to seal the whole shallow slot. In this way, the weather-proof waterproof sealing material can be used for sealing a gap between the waterproof roll and a wall, the possibility of water seepage is reduced, and the overall service life is prolonged.
本发明公开了一种沿墙壁铺设防水卷材的收头防渗水施工工艺,所述防水卷材墙壁铺设的收头防渗水施工工艺包括以下内容:步骤一根据施工工艺将防水卷材沿墙壁铺设至预定高度;步骤二沿所述防水卷材顶端收头位置固定安装防渗水压条,安装时所述防渗水压条的一侧高出所述防水卷材的顶端;步骤三利用所述防渗水压条高出所述防水卷材顶端部分与墙壁和防水卷材顶部一起围出的浅槽填充耐候防水密封材料;步骤四自然干燥所述浅槽内的耐候防水密封材料,使耐候防水密封材料转化成非固化的耐候高粘弹性体封闭住整个浅槽。通过上述方式,本发明能够利用耐候防水密封材料实现对防水卷材与墙体之间缝隙的封闭,减少渗水可能,提高整体使用寿命。
Head-closing anti-seepage construction process for laying waterproof coiled material along wall
The invention discloses a head-closing anti-seepage construction process for laying a waterproof coiled material along a wall. The head-closing anti-seepage construction process for laying the waterproof coiled material along the wall comprises the following steps that firstly, the waterproof coiled material is laid to a preset height along the wall according to the construction process; secondly, an anti-seepage water pressure strip is fixedly installed along the head closing position of the top end of the waterproof coiled material, and one side of the anti-seepage water pressure strip is higher than the top end of the waterproof coiled material during installation; thirdly, a shallow groove defined by the portion, higher than the top end of the waterproof coiled material, of the seepage-proof water pressure strip, the wall and the top of the waterproof coiled material is filled with a weather-proof waterproof sealing material; and 4, naturally drying the weather-proof and waterproof sealing material in the shallow slot, so that the weather-proof and waterproof sealing material is converted into a non-cured weather-proof high-viscosity elastomer to seal the whole shallow slot. In this way, the weather-proof waterproof sealing material can be used for sealing a gap between the waterproof roll and a wall, the possibility of water seepage is reduced, and the overall service life is prolonged.
本发明公开了一种沿墙壁铺设防水卷材的收头防渗水施工工艺,所述防水卷材墙壁铺设的收头防渗水施工工艺包括以下内容:步骤一根据施工工艺将防水卷材沿墙壁铺设至预定高度;步骤二沿所述防水卷材顶端收头位置固定安装防渗水压条,安装时所述防渗水压条的一侧高出所述防水卷材的顶端;步骤三利用所述防渗水压条高出所述防水卷材顶端部分与墙壁和防水卷材顶部一起围出的浅槽填充耐候防水密封材料;步骤四自然干燥所述浅槽内的耐候防水密封材料,使耐候防水密封材料转化成非固化的耐候高粘弹性体封闭住整个浅槽。通过上述方式,本发明能够利用耐候防水密封材料实现对防水卷材与墙体之间缝隙的封闭,减少渗水可能,提高整体使用寿命。
Head-closing anti-seepage construction process for laying waterproof coiled material along wall
一种沿墙壁铺设防水卷材的收头防渗水施工工艺
WU JIANMING (author) / PAN YEMING (author) / LI JINCHUN (author) / XU JIAN (author) / HOU BOYOU (author)
2024-01-23
Patent
Electronic Resource
Chinese
Construction method for outer wall coiled material waterproof layer head closing structure
European Patent Office | 2023
|Coiled material waterproof laying equipment and coiled material waterproof laying method
European Patent Office | 2021
|Polymer waterproof coiled material laying construction method
European Patent Office | 2020
|