A platform for research: civil engineering, architecture and urbanism
Assembling platform and translation incremental launching construction method
The invention discloses an assembling platform and a translation pushing construction method.The assembling platform comprises an assembling support, a transverse pushing device and a rotating pushing device, the assembling support is formed by splicing steel pipes and steel plates, and the assembling support is reasonably built in a limited space according to the size of a steel box girder; a plurality of sections of steel box girders with certain radians are arranged on the assembling support side by side, the rotary pushing device and the transverse pushing device are arranged between the steel box girders and the assembling support, and the transverse pushing device is used for pushing the steel box girders to move in the linear direction. The problems that in the prior art, in the steel box girder pushing construction process across an existing expressway, on-site pushing is needed, and the time consumption is long and the efficiency is low when the steel box girder splicing cycle operation is prolonged are solved.
本发明公开了一种拼装平台及平移顶推施工方法,包括拼装支架、横向顶推装置、转动顶推装置,所述拼装支架由钢管和钢板拼接形成,所述拼装支架根据钢箱梁的尺寸在有限的空间内合理搭建,使得具有一定弧度的多段钢箱梁并列设置在所述拼装支架上,所述转动顶推装置、所述横向顶推装置均设置在钢箱梁和拼装支架之间,所述横向顶推装置用于推动钢箱梁沿直线方向移动,所述转动顶推装置用于推动钢箱梁绕轴线转动包括,该发明解决了现有技术中跨现有高速公路进行钢箱梁顶推施工过程中需要现场顶推、延长钢箱梁拼装循环作业耗时长效率低的问题。
Assembling platform and translation incremental launching construction method
The invention discloses an assembling platform and a translation pushing construction method.The assembling platform comprises an assembling support, a transverse pushing device and a rotating pushing device, the assembling support is formed by splicing steel pipes and steel plates, and the assembling support is reasonably built in a limited space according to the size of a steel box girder; a plurality of sections of steel box girders with certain radians are arranged on the assembling support side by side, the rotary pushing device and the transverse pushing device are arranged between the steel box girders and the assembling support, and the transverse pushing device is used for pushing the steel box girders to move in the linear direction. The problems that in the prior art, in the steel box girder pushing construction process across an existing expressway, on-site pushing is needed, and the time consumption is long and the efficiency is low when the steel box girder splicing cycle operation is prolonged are solved.
本发明公开了一种拼装平台及平移顶推施工方法,包括拼装支架、横向顶推装置、转动顶推装置,所述拼装支架由钢管和钢板拼接形成,所述拼装支架根据钢箱梁的尺寸在有限的空间内合理搭建,使得具有一定弧度的多段钢箱梁并列设置在所述拼装支架上,所述转动顶推装置、所述横向顶推装置均设置在钢箱梁和拼装支架之间,所述横向顶推装置用于推动钢箱梁沿直线方向移动,所述转动顶推装置用于推动钢箱梁绕轴线转动包括,该发明解决了现有技术中跨现有高速公路进行钢箱梁顶推施工过程中需要现场顶推、延长钢箱梁拼装循环作业耗时长效率低的问题。
Assembling platform and translation incremental launching construction method
一种拼装平台及平移顶推施工方法
LIU SHILONG (author) / HU WENTAO (author) / HUANG PENG (author) / WU LIANG (author) / PAN CHUN (author) / CHEN FUXIAN (author) / ZHANG ZHEN (author) / SUN JIUSHUAI (author) / QIN ZHAOYING (author)
2024-01-26
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
European Patent Office | 2024
|