Pipe culvert protection construction method
The invention discloses a pipe culvert protection construction method which comprises the following steps: building a pile foundation construction platform in advance, carrying out pile foundation construction, dismantling the construction platform after the pile foundation construction is completed, then carrying out abutment foundation construction, and finally completing pipe culvert structure construction and road surface layer construction. The method solves the problem that existing pipelines buried in the earlier stage are easily affected in construction due to the fact that a construction area coincides with an earlier-stage commissioning project, and overcomes the technical defects that in a pipeline protection method in the prior art, influences on existing pipelines close to each other cannot be avoided, and the protection effect is poor. The pre-embedded pipeline protection device has the characteristics that the influence on the existing pipeline which is close to the pipeline can be avoided, and the pre-embedded pipeline in the early-stage project can be effectively protected.
本发明公开了一种管涵保护施工方法,该方法通过预先搭设桩基施工平台并进行桩基施工,完成桩基施工后,将施工平台进行拆除,然后进行墩台基础施工,最后完成管涵结构施工和道路面层施工,有效解决了水厂改扩建工程中,由于施工区域与前期投产项目重合,施工中容易影响前期埋设的既有管道的问题,克服了现有技术的管道保护方法中,无法规避对距离较近的既有管线产生影响,并且保护效果不佳的技术缺陷,具有可以避免对距离较近的既有管道产生影响,可以有效对前期工程中的预埋管线进行保护的特点。
Pipe culvert protection construction method
The invention discloses a pipe culvert protection construction method which comprises the following steps: building a pile foundation construction platform in advance, carrying out pile foundation construction, dismantling the construction platform after the pile foundation construction is completed, then carrying out abutment foundation construction, and finally completing pipe culvert structure construction and road surface layer construction. The method solves the problem that existing pipelines buried in the earlier stage are easily affected in construction due to the fact that a construction area coincides with an earlier-stage commissioning project, and overcomes the technical defects that in a pipeline protection method in the prior art, influences on existing pipelines close to each other cannot be avoided, and the protection effect is poor. The pre-embedded pipeline protection device has the characteristics that the influence on the existing pipeline which is close to the pipeline can be avoided, and the pre-embedded pipeline in the early-stage project can be effectively protected.
本发明公开了一种管涵保护施工方法,该方法通过预先搭设桩基施工平台并进行桩基施工,完成桩基施工后,将施工平台进行拆除,然后进行墩台基础施工,最后完成管涵结构施工和道路面层施工,有效解决了水厂改扩建工程中,由于施工区域与前期投产项目重合,施工中容易影响前期埋设的既有管道的问题,克服了现有技术的管道保护方法中,无法规避对距离较近的既有管线产生影响,并且保护效果不佳的技术缺陷,具有可以避免对距离较近的既有管道产生影响,可以有效对前期工程中的预埋管线进行保护的特点。
Pipe culvert protection construction method
一种管涵保护施工方法
LUO PING (author) / ZHU ZHENXIANG (author) / ZHOU WEI (author) / ZHANG MINGXU (author) / JIANG CONGYU (author) / SONG LONGCAI (author) / LIU LUYAO (author) / ZHANG BIN (author) / DU HAN (author) / LIU XIAOQIAN (author)
2024-01-26
Patent
Electronic Resource
Chinese
IPC:
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
/
E02D
FOUNDATIONS
,
Gründungen
/
E03F
SEWERS
,
Abwasserkanäle
Culvert pipe component, culvert pipe assembly, culvert pipe, duct component, duct assembly and duct
European Patent Office | 2020
|Existing pipe culvert hanging type protection combined mechanism and construction method thereof
European Patent Office | 2023
|