Construction method of dry-hanging black brick wall
The invention discloses a construction method of a dry-hanging black brick wall. The construction method comprises the following steps: S1, designing a curtain wall bracket; s2, preparing materials; s3, an embedded part is arranged; s4, pouring concrete; s5, removing the mold; S6, cleaning the hanging slurry on the periphery of the embedded part; s7, releasing an angle steel position line; s8, bottom-layer angle steel is welded; s9, welding seam detection; s10, releasing a fixing piece position line on the angle steel; s11, fixing pieces are welded; s12, welding seam detection; s13, heat preservation plate installation; s14, black brick positioning holes are formed; s15, building is conducted; s16, cleaning and trimming; s17, jointing is conducted; and S18, checking and accepting. According to the scheme, by adopting the steps, the technical problems that in the existing black brick dry hanging construction process, the curtain wall and the main body are poor in overall structure, the shock resistance is insufficient, and the curtain wall is prone to falling off from the main body structure are effectively solved, and the method is worthy of being vigorously popularized.
本发明公开了一种干挂青砖墙施工方法,包括以下步骤:S1幕墙支架设计;S2准备材料;S3设置预埋件;S4浇筑混凝土;S5拆模:S6清理预埋件四周挂浆;S7放出角钢位置线;S8焊接底层角钢;S9焊缝检测;S10角钢上放出固定片位置线;S11焊接固定片;S12焊缝检测;S13保温板安装;S14青砖定位孔开设;S15砌筑;S16清理和修整;S17勾缝;S18验收。本方案通过采用上述步骤,有效解决了现有青砖干挂施工过程中所存在的幕墙与主体整体结构性差,抗震能力不足,容易从主体结构中脱落的技术问题,值得大力推广。
Construction method of dry-hanging black brick wall
The invention discloses a construction method of a dry-hanging black brick wall. The construction method comprises the following steps: S1, designing a curtain wall bracket; s2, preparing materials; s3, an embedded part is arranged; s4, pouring concrete; s5, removing the mold; S6, cleaning the hanging slurry on the periphery of the embedded part; s7, releasing an angle steel position line; s8, bottom-layer angle steel is welded; s9, welding seam detection; s10, releasing a fixing piece position line on the angle steel; s11, fixing pieces are welded; s12, welding seam detection; s13, heat preservation plate installation; s14, black brick positioning holes are formed; s15, building is conducted; s16, cleaning and trimming; s17, jointing is conducted; and S18, checking and accepting. According to the scheme, by adopting the steps, the technical problems that in the existing black brick dry hanging construction process, the curtain wall and the main body are poor in overall structure, the shock resistance is insufficient, and the curtain wall is prone to falling off from the main body structure are effectively solved, and the method is worthy of being vigorously popularized.
本发明公开了一种干挂青砖墙施工方法,包括以下步骤:S1幕墙支架设计;S2准备材料;S3设置预埋件;S4浇筑混凝土;S5拆模:S6清理预埋件四周挂浆;S7放出角钢位置线;S8焊接底层角钢;S9焊缝检测;S10角钢上放出固定片位置线;S11焊接固定片;S12焊缝检测;S13保温板安装;S14青砖定位孔开设;S15砌筑;S16清理和修整;S17勾缝;S18验收。本方案通过采用上述步骤,有效解决了现有青砖干挂施工过程中所存在的幕墙与主体整体结构性差,抗震能力不足,容易从主体结构中脱落的技术问题,值得大力推广。
Construction method of dry-hanging black brick wall
一种干挂青砖墙施工方法
JI JIANHUA (author) / CHE YUEXING (author) / YI GANG (author) / JIN SONGPING (author) / FANG MINGZHEN (author)
2024-01-26
Patent
Electronic Resource
Chinese
European Patent Office | 2024
|Ancient building black brick dry-hanging construction method
European Patent Office | 2020
|Wall whole brick hanging structure and construction method thereof
European Patent Office | 2021
|Dry hanging wall brick system and construction method thereof
European Patent Office | 2023
|