A platform for research: civil engineering, architecture and urbanism
Automatic transfer unearthing device for narrow foundation pit and construction method
The invention discloses an automatic transfer unearthing device for a narrow foundation pit and a construction method.The automatic transfer unearthing device comprises a first conveying belt and a rotatable second conveying belt, the first conveying belt is obliquely arranged, and the output end of the first conveying belt is used for extending out of the foundation pit; the second conveying belt is used for being placed at the bottom of a foundation pit, the second conveying belt is horizontally arranged, and the output end of the second conveying belt is located above the input end of the first conveying belt; the number of the second conveying belts is multiple, the multiple second conveying belts are sequentially arranged in the direction away from the first conveying belt from the first conveying belt, and the input end of the previous second conveying belt of every two adjacent second conveying belts is located below the output end of the next second conveying belt; a support of the second conveying belt is used for being rotationally installed on a foundation pit. And the driving assembly is used for driving the bracket of the second conveying belt to rotate. The construction method has the effect of improving the construction efficiency.
本发明公开了一种狭窄基坑自动转运出土装置及施工方法,其包括第一传送带和可转动的第二传送带,所述第一传送带呈倾斜设置,所述第一传送带的输出端用于延伸出基坑;所述第二传送带用于放置于基坑底部,所述第二传送带呈水平设置,所述第二传送带的输出端位于所述第一传送带的输入端的上方;所述第二传送带设置有若干,若干所述第二传送带自所述第一传送带朝远离所述第一传送带的方向依次设置,相邻的两个所述第二传送带的上一个所述第二传送带的输入端位于下一个所述第二传送带的输出端的下方;所述第二传送带的支架用于转动式安装于基坑;还包括用于驱使所述第二传送带的支架转动的驱动组件。本申请具有提高施工效率的效果。
Automatic transfer unearthing device for narrow foundation pit and construction method
The invention discloses an automatic transfer unearthing device for a narrow foundation pit and a construction method.The automatic transfer unearthing device comprises a first conveying belt and a rotatable second conveying belt, the first conveying belt is obliquely arranged, and the output end of the first conveying belt is used for extending out of the foundation pit; the second conveying belt is used for being placed at the bottom of a foundation pit, the second conveying belt is horizontally arranged, and the output end of the second conveying belt is located above the input end of the first conveying belt; the number of the second conveying belts is multiple, the multiple second conveying belts are sequentially arranged in the direction away from the first conveying belt from the first conveying belt, and the input end of the previous second conveying belt of every two adjacent second conveying belts is located below the output end of the next second conveying belt; a support of the second conveying belt is used for being rotationally installed on a foundation pit. And the driving assembly is used for driving the bracket of the second conveying belt to rotate. The construction method has the effect of improving the construction efficiency.
本发明公开了一种狭窄基坑自动转运出土装置及施工方法,其包括第一传送带和可转动的第二传送带,所述第一传送带呈倾斜设置,所述第一传送带的输出端用于延伸出基坑;所述第二传送带用于放置于基坑底部,所述第二传送带呈水平设置,所述第二传送带的输出端位于所述第一传送带的输入端的上方;所述第二传送带设置有若干,若干所述第二传送带自所述第一传送带朝远离所述第一传送带的方向依次设置,相邻的两个所述第二传送带的上一个所述第二传送带的输入端位于下一个所述第二传送带的输出端的下方;所述第二传送带的支架用于转动式安装于基坑;还包括用于驱使所述第二传送带的支架转动的驱动组件。本申请具有提高施工效率的效果。
Automatic transfer unearthing device for narrow foundation pit and construction method
一种狭窄基坑自动转运出土装置及施工方法
CHEN XUFENG (author) / ZHENG YIWEN (author) / HUANG JIANCHAO (author) / LIN CHUANWU (author)
2024-01-30
Patent
Electronic Resource
Chinese
Construction method for automatic and rapid unearthing of deep foundation pit
European Patent Office | 2022
|Vertical unearthing elevator for deep foundation pit and unearthing method
European Patent Office | 2024
|Subway station deep foundation pit riding track type rapid unearthing construction method
European Patent Office | 2022
|Construction technology suitable for supporting and unearthing of foundation pit close to building
European Patent Office | 2023
|Deep foundation pit rapid unearthing construction method by combining trestle with in-pit road
European Patent Office | 2021
|