Hanging and buckling combined cable crane tower construction method
The invention belongs to the technical field of cable crane tower construction, and particularly relates to a hoisting and buckling combined cable crane tower construction method which comprises the following steps: step 1, construction preparation: firstly, controlling installation of 1-6 # arch rib sections on two sides of a middle pier to be completed, installing a middle pier buckling tower in place, and preparing an intelligent adjusting cable system; the intelligent adjusting cable system is composed of an intelligent jack, an intelligent load adjusting hydraulic pump station, a Beidou control system, an adjusting cable and an anchoring device. According to the hoisting and buckling integrated cable crane tower construction method, an efficient, flexible and safe construction mode is achieved by combining the crane tower and a cable hoisting system, and then the construction efficiency is improved; in the whole construction process, the tower crane does not need to be disassembled and built, a large amount of time and labor cost are saved, and the construction efficiency is improved.
本发明属于缆索吊塔架施工技术领域,尤其是一种吊扣合一的缆索吊塔架施工方法,包括以下步骤,步骤一、施工准备,先控制中墩两侧1~6#拱肋节段安装完成,中墩扣塔安装到位,以及智能调节索系统的准备,智能调节索系统由智能千斤顶、智能调载液压泵站、北斗控制系统、调节索和锚固装置构成。该吊扣合一的缆索吊塔架施工方法,本装置通过将吊塔架和缆索吊装系统相结合达到了高效、灵活且安全的施工方式,进而提高施工效率:吊扣合一的缆索吊塔架施工方法能够实现吊塔起重机与缆索吊装系统的无缝衔接,整个施工过程中不需要拆卸和搭建吊塔,节省了大量时间和人力成本,提高了施工效率。
Hanging and buckling combined cable crane tower construction method
The invention belongs to the technical field of cable crane tower construction, and particularly relates to a hoisting and buckling combined cable crane tower construction method which comprises the following steps: step 1, construction preparation: firstly, controlling installation of 1-6 # arch rib sections on two sides of a middle pier to be completed, installing a middle pier buckling tower in place, and preparing an intelligent adjusting cable system; the intelligent adjusting cable system is composed of an intelligent jack, an intelligent load adjusting hydraulic pump station, a Beidou control system, an adjusting cable and an anchoring device. According to the hoisting and buckling integrated cable crane tower construction method, an efficient, flexible and safe construction mode is achieved by combining the crane tower and a cable hoisting system, and then the construction efficiency is improved; in the whole construction process, the tower crane does not need to be disassembled and built, a large amount of time and labor cost are saved, and the construction efficiency is improved.
本发明属于缆索吊塔架施工技术领域,尤其是一种吊扣合一的缆索吊塔架施工方法,包括以下步骤,步骤一、施工准备,先控制中墩两侧1~6#拱肋节段安装完成,中墩扣塔安装到位,以及智能调节索系统的准备,智能调节索系统由智能千斤顶、智能调载液压泵站、北斗控制系统、调节索和锚固装置构成。该吊扣合一的缆索吊塔架施工方法,本装置通过将吊塔架和缆索吊装系统相结合达到了高效、灵活且安全的施工方式,进而提高施工效率:吊扣合一的缆索吊塔架施工方法能够实现吊塔起重机与缆索吊装系统的无缝衔接,整个施工过程中不需要拆卸和搭建吊塔,节省了大量时间和人力成本,提高了施工效率。
Hanging and buckling combined cable crane tower construction method
一种吊扣合一的缆索吊塔架施工方法
YAN BEIBEI (author) / LIU ZHUOXIN (author) / LIU ZHIPENG (author) / LI GUOCHANG (author) / LI HAORAN (author) / ZHANG HAIXIA (author) / LI QIANGQIANG (author) / YIN MINGCHANG (author) / HUI WUBING (author)
2024-02-02
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
European Patent Office | 2022
|Wind cable anchoring system and construction method of cable hanging tower
European Patent Office | 2020
|Cable-stayed bridge tower rope hanging construction method and hanging operating platform device
European Patent Office | 2020
|