Integral formwork assembly for slope protection lattice beam pouring and construction method of integral formwork assembly
The invention discloses an integral formwork assembly for slope protection lattice beam pouring and a construction method of the integral formwork assembly. The formwork assembly comprises formwork blocks, rectangular lattice units defined by the eight formwork blocks and a lap joint assembly used for connecting the two lattice units. A cross adapter is arranged on the inner side of one formwork block on each edge of the lattice unit, steel hanging belts are rotationally connected into the cross adapters, and the four steel hanging belts are rotationally connected with the bottom of a weighting hanging scaffold located in the center of the lattice unit. The construction method comprises the following steps that S1, the lattice units are hoisted; s2, the lattice units are in lap joint; s3, concrete is poured; and S4, the lattice units are dismantled. According to the slope protection formwork, the eight formwork blocks are integrated into a whole to serve as the lattice unit, so that hoisting can be conveniently carried out in cooperation with large hoisting equipment during construction, and the defects that a traditional slope protection formwork is tedious to disassemble and assemble, a large amount of labor is consumed, and large equipment cannot be used for cooperative construction are overcome.
本发明公开了一种护坡格构梁浇筑用整体式模板组件及其施工方法,模板组件包括模板块、由8个模板块围成的矩形的格构单元、以及用于连接两个格构单元的搭接组件,在格构单元的每一条边上的其中一个模板块内侧均设有一个十字转接头,十字转接头内转动连接设有钢吊带,4个钢吊带均与位于格构单元中心处的加重吊盘底部转动连接。施工方法包括以下步骤:S1、吊装格构单元;S2、搭接格构单元;S3、浇筑混凝土;S4、拆除格构单元。本发明通过将8个模板块整合成一个整体作为格构单元,从而方便在进行施工时配合大型吊装设备进行吊装,避免了传统护坡模板的拆装繁琐、消耗大量人工、无法使用大型设备配合施工的弊端。
Integral formwork assembly for slope protection lattice beam pouring and construction method of integral formwork assembly
The invention discloses an integral formwork assembly for slope protection lattice beam pouring and a construction method of the integral formwork assembly. The formwork assembly comprises formwork blocks, rectangular lattice units defined by the eight formwork blocks and a lap joint assembly used for connecting the two lattice units. A cross adapter is arranged on the inner side of one formwork block on each edge of the lattice unit, steel hanging belts are rotationally connected into the cross adapters, and the four steel hanging belts are rotationally connected with the bottom of a weighting hanging scaffold located in the center of the lattice unit. The construction method comprises the following steps that S1, the lattice units are hoisted; s2, the lattice units are in lap joint; s3, concrete is poured; and S4, the lattice units are dismantled. According to the slope protection formwork, the eight formwork blocks are integrated into a whole to serve as the lattice unit, so that hoisting can be conveniently carried out in cooperation with large hoisting equipment during construction, and the defects that a traditional slope protection formwork is tedious to disassemble and assemble, a large amount of labor is consumed, and large equipment cannot be used for cooperative construction are overcome.
本发明公开了一种护坡格构梁浇筑用整体式模板组件及其施工方法,模板组件包括模板块、由8个模板块围成的矩形的格构单元、以及用于连接两个格构单元的搭接组件,在格构单元的每一条边上的其中一个模板块内侧均设有一个十字转接头,十字转接头内转动连接设有钢吊带,4个钢吊带均与位于格构单元中心处的加重吊盘底部转动连接。施工方法包括以下步骤:S1、吊装格构单元;S2、搭接格构单元;S3、浇筑混凝土;S4、拆除格构单元。本发明通过将8个模板块整合成一个整体作为格构单元,从而方便在进行施工时配合大型吊装设备进行吊装,避免了传统护坡模板的拆装繁琐、消耗大量人工、无法使用大型设备配合施工的弊端。
Integral formwork assembly for slope protection lattice beam pouring and construction method of integral formwork assembly
一种护坡格构梁浇筑用整体式模板组件及其施工方法
QU XIAOBIN (author) / WANG YIN (author) / AN DONGSHENG (author) / CUI GUANGHUI (author) / MAO WEIXING (author) / YU SHANYOU (author) / YI GUANGQUAN (author) / OUYANG HONG (author) / ZHANG JIN (author)
2024-02-02
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2023
|European Patent Office | 2024
|Formwork, formwork, pouring system and construction method
European Patent Office | 2023
|Shear wall integral movable formwork and pouring construction method thereof
European Patent Office | 2023
|