A platform for research: civil engineering, architecture and urbanism
Double-spliced hanging basket hoisting construction device
The invention relates to the field of bridge building construction, in particular to a double-spliced hanging basket hoisting construction device.An adjusting assembly comprises a sliding cross beam, a transverse jack and a longitudinal jack, the longitudinal jack is installed at the upper end of a double-spliced hanging basket, and the other end of the longitudinal jack is connected to the sliding cross beam; the hoisting device has the beneficial effects that by arranging the double-spliced hanging basket composed of the double trusses, supporting of hoisting of a prefabricated part is achieved, the hoisting supporting strength is improved, meanwhile, by means of adjustment of the floating box and the traction rope, the hoisting supporting strength is improved, and the hoisting effect of the prefabricated part is improved. According to the hoisting device for the prefabricated part, transportation and positioning adjustment of the prefabricated part are achieved, the hoisting beam is precisely matched with a lug seat on the prefabricated part in cooperation with positioning of the correcting device, and therefore the hoisting precision is improved, the prefabricated part is precisely matched with a box beam after being hoisted, and the efficiency and precision of bridge construction are greatly improved.
本发明涉及桥梁建筑施工领域,具体为一种双拼挂篮吊装施工装置,调节组件包括滑动横梁、横向千斤顶和纵向千斤顶,纵向千斤顶安装在双拼挂篮的上端,纵向千斤顶的另一端连接在滑动横梁上,滑动横梁的两端设置有一对相对设置的横向千斤顶,双拼挂篮的前端设置有矫正组件,有益效果为:通过设置双桁架组成的双拼挂篮,实现对预制件吊装的支撑,提高了吊装支撑的强度,同时利用浮箱和牵引绳的调节,实现对预制件的运输和定位调节,配合矫正装置的定位,使得吊装梁与预制件上耳座进行精确适配,从而提高了吊装的精度,使得预制件在吊装后与箱梁之间精确适配,从而大大提高了桥梁施工的效率和精度。
Double-spliced hanging basket hoisting construction device
The invention relates to the field of bridge building construction, in particular to a double-spliced hanging basket hoisting construction device.An adjusting assembly comprises a sliding cross beam, a transverse jack and a longitudinal jack, the longitudinal jack is installed at the upper end of a double-spliced hanging basket, and the other end of the longitudinal jack is connected to the sliding cross beam; the hoisting device has the beneficial effects that by arranging the double-spliced hanging basket composed of the double trusses, supporting of hoisting of a prefabricated part is achieved, the hoisting supporting strength is improved, meanwhile, by means of adjustment of the floating box and the traction rope, the hoisting supporting strength is improved, and the hoisting effect of the prefabricated part is improved. According to the hoisting device for the prefabricated part, transportation and positioning adjustment of the prefabricated part are achieved, the hoisting beam is precisely matched with a lug seat on the prefabricated part in cooperation with positioning of the correcting device, and therefore the hoisting precision is improved, the prefabricated part is precisely matched with a box beam after being hoisted, and the efficiency and precision of bridge construction are greatly improved.
本发明涉及桥梁建筑施工领域,具体为一种双拼挂篮吊装施工装置,调节组件包括滑动横梁、横向千斤顶和纵向千斤顶,纵向千斤顶安装在双拼挂篮的上端,纵向千斤顶的另一端连接在滑动横梁上,滑动横梁的两端设置有一对相对设置的横向千斤顶,双拼挂篮的前端设置有矫正组件,有益效果为:通过设置双桁架组成的双拼挂篮,实现对预制件吊装的支撑,提高了吊装支撑的强度,同时利用浮箱和牵引绳的调节,实现对预制件的运输和定位调节,配合矫正装置的定位,使得吊装梁与预制件上耳座进行精确适配,从而提高了吊装的精度,使得预制件在吊装后与箱梁之间精确适配,从而大大提高了桥梁施工的效率和精度。
Double-spliced hanging basket hoisting construction device
一种双拼挂篮吊装施工装置
HU SONGTAO (author) / LUO YANG (author) / HE HONGBO (author) / HUANG PEIRANG (author) / SUN YUEYUE (author) / WU ZHENGYI (author) / HU TENGFEI (author) / WANG DI (author)
2024-02-06
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
European Patent Office | 2024
|Hanging basket with good wind resistance for bridge construction hoisting equipment
European Patent Office | 2022
|Hanging basket assembly and hanging basket construction method
European Patent Office | 2022
|European Patent Office | 2023
|