Aerial work hanging basket device for bridge construction and using method
The invention discloses a high-altitude operation hanging basket device for bridge construction and a using method, and belongs to the technical field of bridge construction, the high-altitude operation hanging basket device comprises a frame basket, universal wheels are installed at the four corners of the bottom end of the frame basket in a threaded mode, side wall plates are assembled at the left end and the right end of the frame basket, and front wall plates are assembled at the front end and the rear end of the frame basket; the lifting arm assemblies are installed at the top of the frame basket and located on the left side and the right side of the frame basket, and each lifting arm assembly comprises a small lifting arm assembled in the middle of the left side and the right side of the frame basket. According to the high-altitude operation hanging basket for bridge construction, the inclined handrails on the inner sides of the oval rib frames are detached from the buckling grooves, and the inclined handrails are flatly placed in the frame basket, so that the safety of constructors is guaranteed, meanwhile, a squatting operation window is provided for the constructors, and the hanging basket has a squatting operation use mode capable of relieving fatigue.
本发明公开了一种桥梁建设施工用高空作业吊篮装置及使用方法,属于桥梁建设施工技术领域,其包括框架篮,所述框架篮的底端四角均螺纹安装有万向轮,所述框架篮的左右端均组装有侧壁板,且所述框架篮的前后端均组装有正壁板,还包括吊臂组件,该吊臂组件安装在框架篮的顶部,且位于框架篮的左右两侧设置,所述吊臂组件包括组装在框架篮左右边侧中部的小吊臂。本发明的桥梁建设施工用高空作业吊篮,通过将椭圆筋框内侧的斜栏杆从扣槽中拆下,将斜栏杆平放在框架篮内,保障施工人员的安全,同时为施工人员提供蹲坐式的作业窗口,使吊篮具备可缓解疲劳的蹲坐式作业使用模式。
Aerial work hanging basket device for bridge construction and using method
The invention discloses a high-altitude operation hanging basket device for bridge construction and a using method, and belongs to the technical field of bridge construction, the high-altitude operation hanging basket device comprises a frame basket, universal wheels are installed at the four corners of the bottom end of the frame basket in a threaded mode, side wall plates are assembled at the left end and the right end of the frame basket, and front wall plates are assembled at the front end and the rear end of the frame basket; the lifting arm assemblies are installed at the top of the frame basket and located on the left side and the right side of the frame basket, and each lifting arm assembly comprises a small lifting arm assembled in the middle of the left side and the right side of the frame basket. According to the high-altitude operation hanging basket for bridge construction, the inclined handrails on the inner sides of the oval rib frames are detached from the buckling grooves, and the inclined handrails are flatly placed in the frame basket, so that the safety of constructors is guaranteed, meanwhile, a squatting operation window is provided for the constructors, and the hanging basket has a squatting operation use mode capable of relieving fatigue.
本发明公开了一种桥梁建设施工用高空作业吊篮装置及使用方法,属于桥梁建设施工技术领域,其包括框架篮,所述框架篮的底端四角均螺纹安装有万向轮,所述框架篮的左右端均组装有侧壁板,且所述框架篮的前后端均组装有正壁板,还包括吊臂组件,该吊臂组件安装在框架篮的顶部,且位于框架篮的左右两侧设置,所述吊臂组件包括组装在框架篮左右边侧中部的小吊臂。本发明的桥梁建设施工用高空作业吊篮,通过将椭圆筋框内侧的斜栏杆从扣槽中拆下,将斜栏杆平放在框架篮内,保障施工人员的安全,同时为施工人员提供蹲坐式的作业窗口,使吊篮具备可缓解疲劳的蹲坐式作业使用模式。
Aerial work hanging basket device for bridge construction and using method
一种桥梁建设施工用高空作业吊篮装置及使用方法
DUAN TAO (author) / SONG GUOLIANG (author) / CAO SHUN (author)
2024-02-06
Patent
Electronic Resource
Chinese