A platform for research: civil engineering, architecture and urbanism
Hollowed-out stone curtain wall mounting method
A hollow stone curtain wall installation method comprises the following steps that the installation position of a rear embedded part is determined according to a drawing, and the rear embedded part is installed; determining the installation position of the installation keel, and pulling a steel wire rope to limit the installation position of the installation keel; the mounting keel is assembled on the rear embedded part under the limitation of a steel wire rope; and the hollowed-out stone curtain plates are assembled at the corresponding positions of the installation keels. According to the hollowed-out stone curtain wall installation method, the position of the installation keel can be well positioned through the rear embedded part, then the installation position of the installation keel can be further limited through the steel wire rope, limitation comprises the height direction, the width direction and the height protruding out of the front, and after the position of the installation keel is accurately positioned, the installation position of the installation keel is limited. Therefore, the installation precision of the hollowed-out stone curtain plate is improved, and the problems that the hollowed-out stone curtain plate is not flat and the perpendicularity exceeds the range are solved.
一种镂空石材幕墙安装方法,该镂空石材幕墙安装方法包括如下步骤:根据图纸确定后置埋件的安装位置,并安装后置埋件;确定安装龙骨的安装位置,并拉设钢丝绳以限定安装龙骨的安装位置;在钢丝绳的限位下将所述安装龙骨装配在所述后置埋件上;将镂空石材幕板装配在对应的安装龙骨上的位置。该镂空石材幕墙安装方法,通过后置预埋件能够很好的定位安装龙骨的位置,然后通过钢丝绳可以进一步限定安装龙骨的安装位置,该限定包括高度、宽度方向及凸出于前面的高度,在安装龙骨的位置定位准确后,从而提升镂空石材幕板的安装的精度,避免不平整及垂直度超出范围的问题出现。
Hollowed-out stone curtain wall mounting method
A hollow stone curtain wall installation method comprises the following steps that the installation position of a rear embedded part is determined according to a drawing, and the rear embedded part is installed; determining the installation position of the installation keel, and pulling a steel wire rope to limit the installation position of the installation keel; the mounting keel is assembled on the rear embedded part under the limitation of a steel wire rope; and the hollowed-out stone curtain plates are assembled at the corresponding positions of the installation keels. According to the hollowed-out stone curtain wall installation method, the position of the installation keel can be well positioned through the rear embedded part, then the installation position of the installation keel can be further limited through the steel wire rope, limitation comprises the height direction, the width direction and the height protruding out of the front, and after the position of the installation keel is accurately positioned, the installation position of the installation keel is limited. Therefore, the installation precision of the hollowed-out stone curtain plate is improved, and the problems that the hollowed-out stone curtain plate is not flat and the perpendicularity exceeds the range are solved.
一种镂空石材幕墙安装方法,该镂空石材幕墙安装方法包括如下步骤:根据图纸确定后置埋件的安装位置,并安装后置埋件;确定安装龙骨的安装位置,并拉设钢丝绳以限定安装龙骨的安装位置;在钢丝绳的限位下将所述安装龙骨装配在所述后置埋件上;将镂空石材幕板装配在对应的安装龙骨上的位置。该镂空石材幕墙安装方法,通过后置预埋件能够很好的定位安装龙骨的位置,然后通过钢丝绳可以进一步限定安装龙骨的安装位置,该限定包括高度、宽度方向及凸出于前面的高度,在安装龙骨的位置定位准确后,从而提升镂空石材幕板的安装的精度,避免不平整及垂直度超出范围的问题出现。
Hollowed-out stone curtain wall mounting method
镂空石材幕墙安装方法
KONG WEIYI (author) / WU YAXUAN (author) / QIN XIAQIANG (author) / GONG JUNSONG (author) / ZUO XIAOWU (author) / GAO LINYUN (author) / HU GUI (author)
2024-02-06
Patent
Electronic Resource
Chinese
Stone curtain wall and method for assembling and mounting stone curtain wall
European Patent Office | 2015
|Method for quickly building hollowed-out argil brick curtain wall
European Patent Office | 2024
|Hollowed-out archaized brick curtain landscape wall and construction method thereof
European Patent Office | 2021
|